1881–1883 15th Street
Mission · San Francisco, CA 94103
Permit history
-
Mar 2023
Reroofing.
-
Oct 2017
Double-hung tilt-pacs with ogee lugs. wood inside, wood exterior. match/remove existing in front of property visible to street. replace (9) windows total.
-
Apr 2014
Interior remodeling to both units including kitchen & dining room, rebuild rear stair in kind.
-
Dec 2013
Existing bathroom remodel. new bathroom creation with shower, one vanity and relocate toilet.
-
Oct 2013
Bathroom remodel on 2nd fl, lower unit. lighting must comply with cec 150k.
-
Dec 2009
Revision to permit application 2009.10.15.8980 to add 4 footings, 2 grade beams, 2 moment frames, replacement of wood post and beams with steel posts and beams, and to add plywood sheating on walls and ceiling.
-
Oct 2009
Replace approximately 65-75' foundation.
-
Sep 2009
To obtain final inspection for work approved under permit application 200808128912.
-
Aug 2008
Remodel a kitchen & bathroom from storage area. cap off all plumbing and electrical.
-
Feb 2000
Replace 4 windows and 1 garden window, restucco garden window only.
-
Nov 1999
Remove the fungus damaged woods, replace with nre material @deck.
-
Jan 1997
Repair rear wood stairway.
-
Oct 1995
Reroofing.
1 nominal $1 street-space permit is omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.