2435–2445 16th Street
Mission · San Francisco, CA 94103
-
April 2, 1951
The Office of the Assessor-Recorder photographed the property for tax assessment. Floor Styles, Inc was at the address.
-
Sep 1990
Reroofing.
-
Mar 1994
Parapet reinforcement to comply with parapet ordinance.
-
Mar 1994
Install paint spray booth.
-
Mar 1994
Install pyro chem fire system.
-
Apr 1994
Comply with parapet ordinance.
-
Jul 2009
Remodel existing kitchen, bath room. add one new bathroom and study room. all work at 2nd floor. construct one bedroom, storage room, two bath rooms and upgrade existing bed room at ground floor.
-
Oct 2010
Install hc accessible restroom - barrier removal.
-
Jan 2011
Revision to app#201010132890. comply with physical inspection report cc-5908. legalize storage loft & new stairs. minor revision to location of restroom, construct code compliant stairs to storage loft.
-
Sep 2011
Condo conversion for block#3965, lot#021 2435 16th st. to new lot#031.
-
Oct 2011
Install main door at front facade. barrier removal @ window location.
-
Jan 2012
Install ada ramp at entrance. barrier removal. all interior work.
-
Feb 2012
Proposed gasline permit for a heater unit (1, 000, 000 btu) within a existing building, heater on spray booth.legalize existing sparay booth for planning purposes.
-
Apr 2012
Install accessory office for autoglass shop, install 2nd ada restroom. replace front window in kind.
-
Jun 2012
Fabrication and installation of exterior illuminated blade sign.
-
Oct 2015
Replace concrete pavement of drive way in front of garage include about 25ft sidewal replace in kind.
-
Nov 2015
Remove/replace existing footing with new as shown.
-
Dec 2015
Erect 7 stories, 1 basement, type 1, 53 dwelling units, mix use building.
-
Dec 2015
Demolish auto repair shop.
-
Mar 2021
Base building improvement of interior renovation of existing 1st fl tenant spaces for future tenant. demolition of existing non-bearing partitions, existing demising walls, existing restrooms, platform, existing mezzanine & existing ramp. new construction of partitions, finishes, accessible restroom, ada lift, exit & hvac upgrade.
-
Mar 2021
Installation of nfpa 13 automatic fire sprinkler system in existing building. ref #: 2021-0316-6591.
-
May 2021
Install new 6" underground fire service for fire sprinkler system (ref. #2021-0329-7476 & #2021-0316-6591).
-
Mar 2022
Installing a fire sprinkler water flow & sprinkler supervisory system. ref permit application 202105110174 & 202103297476.
-
May 2022
Revision to the approved bpa 202103166591 - base building improvement. revision scope of work limited to relocate electrical room.
-
Oct 2023
G/f: base building improvement. scope of work includes but not limited to demolition of existing accessory offices and conference room.
DBI holds 29 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 29.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update