3000 16th Street
Mission · San Francisco, CA 94103
Permit history
-
Aug 1984
Painting, tile, glazing thermal cover, install equipment.
-
Aug 1995
Renovation of existing enclosure incl antena install to penthouse.
-
Oct 1999
To construct mechanical sump pump and ventilation system.
-
Jul 2012
Wireless facility modification & replace 6 panel antennas with 3 new panel antennas, add 2 new equipment cabinets. no power upgrade.
-
Mar 2014
Sprint proposes to modify an existing unmanned telecommunication facility. 3 existing antennas will be replaced with 3 new tri-band antennas on existing penthouse. 3 rrh units to be installed below antennas. 1 string of batterres to be installed in existing battery cabinets.
-
Dec 2014
Demolition of interior partitiions at 2, 3 & 4.
-
Apr 2015
Voulntary code and life safety upgrade of existing retail and office space within the building - demolition of existing elevator, stairs, mechanical equip and ele as req'd - new partitions, elevator & stairs.
-
Jun 2015
Remove nextel antennas, mounts, coax, cable tray, radio equipment & gps atennas. fire rated assemblies to be maintained/patch roofing as necessary.
-
Aug 2015
Uru rooftop 8-ton units & refridgerant lines. osa fan on roof fsd & ductwork.
-
Aug 2015
Fire sprinkler per nfpa 13 and standpipe systems for entire building. 175 heads ref pa 2015 0402 2593.
-
Sep 2015
Revision to pa 2015 0806 3475; 2015-0402-2593 and 201504022593 - structural work.
-
Sep 2015
New fire alarm system core and shell to include: 1 facu, one power supply, 1 pull station, 8 smoke detectors, 4 heat detectors, 2 monitor modules, 6 dual monitor modules, 13 relay modules, 13 relay moudles, 6 duct detectors, 3 voltage relays, 10 strobes, 17 horn/stobes. ref app#201504022593.
-
Mar 2016
Revision to pa 2015-0402-2593. exit passage way from basement stairs 1 & 2 to lobby. staircase #1 create 2 hour rating on level1.
-
Sep 2016
2nd & 3rd floor - demolition of a few non-structural walls, removal of plaster from walls - per ab-017.
-
Sep 2016
As builts for ref 201504214138, 201605187737 & 201603041226.
-
Nov 2016
2nd floor: ti - of existing office space mep & sprinklers on sep permit - as necessary for remodel.
-
Nov 2016
3rd floor: ti - of existing office space mep & sprinklers on sep permit - as necessary for remodel.
-
Nov 2016
Reference pa 2016-1101-1630 mep only permit new electrical, lighting and plumbing fixtures in remodel office ti.
-
Nov 2016
Reference pa 2016-1101-1632 mep only permit. new electrical, lighting and plumbing fixtures in remodel office ti.
-
Jul 2017
Ti to include upgrade to (1) existing single occupant toilet, new non-structural interior partitions. mep, fire alarm & sprinkler under separate permit.
-
Aug 2017
Ti for title 24 electrical. ref #201707141867.
-
Aug 2017
4/f- provide & install new hvac distribution from existing rooftop units. relocate existing lavatory to meet ada requirements. t.i. permit application 201707141867.
-
Oct 2024
Upgrade existing commericial entries per ordiance 51-16 abe program to comply with accesible entrance program. abe #202410160267 1. reconfigure security gate 2. replace threshhold 3. relocate power door operation.
-
Jul 2025
Remodeling vacant retail space into a coffee and juice shop. no structural work. no exterior work.
-
Dec 2025
Modification of an existing fire sprinkler system for new t.i. 9 fire sprinkler heads nfpa 13. ref #202410012056.
DBI holds 54 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 54. 13 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update