1925
Built as an industrial building, recorded as occupied by A.L. Greene Warehouse and Multi- use factories. Built by Cahill Brothers.
-
1941
A loading dock was converted to pedestrian use.
-
1983
Thirteen aluminium windows were installed.
-
Jul 1997
Repair stucco on existingleading platform & place bumper strips.
-
Nov 1998
Reroofing.
-
Oct 1999
Seismic upgrade n/elevtr repla window dors n/accessible restrms n/front entrance n/garage at 1/f.
-
2000
The entrance was replaced and a garage added.
-
Jan 2000
Provide interior demolition per plan.
-
Jun 2000
Revise to app #9921303 t/i new partitions enw restrms flooring bracing for mechanical cutouts in roof mep.
-
Aug 2000
Addition of 120 sprinklers to basement parking and 20' 6" underground fire service.
-
Aug 2000
Design & installation of fire protection system (sprinklers).
-
Aug 2000
Fire alarm system installation.
-
Sep 2000
Mechanical electrical & plumbing duct wrk fans electrical outlets interior lighting & title 24 t.i. app #.
-
Sep 2000
Provide life safety per plans t.i. app #.
-
Jan 2001
Admin correcn to plans-replace viking model m q. r. sprinklers with central model a -200008046963-chan.
-
Jun 2005
No structural wk.alter to existingoffice spaces, creation of new office spaces on 1st, 2nd, 3rd floors.
-
Aug 2005
Revision to permit application 2005/06/13/4960. new interior walls at entry, vestibule on 1st floor. new doors.
-
Dec 2013
Non electric wall sign.
-
Aug 2017
1968 sq ft of interior tenant improvement to include offices, exam rooms & support spaces. automatic sprinkler, fire alarm system and mep scope of work under separate permit.
-
Feb 2018
3rd floor: fire sprinkler t.i.: relocated heads=3 heads. added sprinklers= 2 heads. total 5 heads x (514) ref app#201708043874 n/a for maher.
-
Feb 2018
Electrical scope: partial scope ti retrofit, lighting, power signal wiring, lighting & controls. hvac - demolition as necessary. remodel 3 vav zones, new exposed duct & grilles. relocate 3 pneumatic thermostats, 1 new vav maher na.
-
Jul 2018
Add access stair from level 2 to outside graden area.
-
Oct 2018
Gournd fl: rev to permit application 201708043874; incorporation of a railing and curb at the exterior entry landing.
-
Apr 2020
Reroofing.