3101–3149 19th Street
Mission · San Francisco, CA 94110
-
1913
Built as an industrial building, recorded as occupied by American Can Co.
-
Jun 1988
Re-partitioning 2 exist offices & related electrical/mechanical/f.sprklr.
-
May 1992
Eq damage- repair concrete/brick, install steel seismc brac'g.
-
Feb 1999
Renovate existing3 story building(with n struct 104f).
-
Apr 1999
Exterior renovation.
-
Aug 1999
Oti 1 1st floor, el, me ls & sp.
-
Aug 1999
Oti-1 electrical, mechanical, life safty, sprinkler 2nd floo.
-
Aug 1999
Oti-2 el, me, 2nd floor.
-
Aug 1999
Mmi-2 el me 1/f.
-
Aug 1999
Oti-2 el, me, 3rd floor.
-
Feb 2000
Oti-1 3rd floor el, me, l/s, sp.
-
Jan 2003
Demolition of existing offece, conferance, breakroom and storage space /new and relocated of gyp bd prtn.
-
Dec 2012
2nd floor & roof-replace 1 liebert air handler unit in computer room, replace 2 liebert condensing units on roof (new one unit lbs).
-
Jan 2017
Tenant improvement to consist of demolition of non-structural partitions, new partitions and finishes; mep & fire, life safety under separate permit; maher ord 155-13 na.
-
Jun 2017
Adding 2 walls between existing offices and creating 2 new offices on the 1st floor. adding kitchenette area with new sitting area. new electrical and plumbing in new kitchenette. maher na.
-
Aug 2019
Replace (4) ac units, (3) exhaust fans, (1) boiler system on the roof. maher na.
-
Mar 2021
1st, 2nd, 3rd fl: restrooms upgrades to include new millwork, finishes, and restroom accessories. electrical, plumbing & life safety under separate permit.
-
Apr 2022
1st fl (ste 100 & 150): tenant improvement to include selsctive demolition & construction of non-load bearing partitions, new ceilings over pantry area, new light fixtures, new office doors + frames. new millwork, new sinks. mep under separate permit.
-
Jun 2022
Suite 100 & 150: mechanical for t.i. mechanical and electrical. ref app#202204182383.
-
May 2023
Remove existing tar and gravel. existing roof membrane to remain. install one layer of 2" iso insulation and siplast modified bitumen roof system. existing roof has r-19 insulation - add minimum r-10 insulation above roof deck. cool roof ceec id 0742-0018 - siplast paradiene 30 rg tg bw (sri 92).
-
Jun 2023
3/f: mods of existing t.i. to include selectrive partial demolition on non-load bearing partitions and addition of new glazing and framings, new door, frames and finishes.
-
Aug 2023
3/f: electrical work for tenant improvement, ref permit application 202306099685.
-
Sep 2023
Roof deck to be enlarged & enhancced. increase the perimeter of deck by 4' along 3 sides, reconfigure the ramp system to be compliant with accessibility.
-
Nov 2023
Rooftop: install new trellis shade structure.
-
Dec 2025
12 ev chargers to be instal at existing parking stalls in a private fenced building park lot. 2 new 600v transformers instal on a new concrete pad with safety bollards. parking restriping where faded in same loc. trenching for a new below grade conduit run to new ev charger. level 2 chargers only.
-
Apr 2026
New gender neutral resterooms - demolition, new partitions, ceilings, and finishes.
DBI holds 66 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 66. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update