2830–2834 22nd Street
Mission · San Francisco, CA 94110
Permit history
-
Dec 2024
Reroofing: remove and replace roofing material / existing roofing material (in-kind).
-
Oct 2014
Add addresses to block 4146, lot 019 as; 2832 22nd st (front building), 2834 22nd st (rear building).
-
Aug 2014
Provide fire sprinkler underground. ref. appl. 201407080672.
-
Jul 2014
For administration purpose, revise permit application 201210011010s, correct scope of work; 3rd dwelling unit not added to existing 2 unit, 3 story front building; instaead the unit is added to rear 2 story building. rear building occupancy conver storage to sfd. front building remains two unit. no change to oringal plan.
-
Jul 2014
Installation of fire system per nfpa 13d for rear cottage nad exit passage way on front building. underground separate permit- ref app#201210011010.
-
Oct 2012
Add 3rd dwelling unit to existing 2 unit building. remodel rear cottage to include kitchen, bathroom, half bath living rm, dining rm & bedroom. (reate new bridge to connect front building to rear cottage. new 3rd unit will be in rear cottage.
-
Aug 2012
Structural upgrade of existing rear cottage per plan. new beams, joists, new foundation, grade beams, slab, add plywood strengthening t walls.
-
Aug 2012
Remodel: new full bath @ ground floor one unit, relocate existing one unit kitchen. remodel 2nd floor new kitchen, baths and living areas. remodel existing bath @ 3rd floor. new interior stairs. new fire rated corridors. structural upgrade per plans. relocate front entrance.
-
May 2012
Replacing 2 kitchens, replacing 4 bathrooms, install insulation @ liv/dining, demolition & re-installing sheetrock; interior remodel, all work in kind.
-
Feb 2012
Comply with complaint #199815800-remove cooking (kitchen) & bathroom facilities at cottage located at the rear of lot.
-
Oct 2000
Reroofing.
2 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.