3179 23rd Street
Mission · San Francisco, CA 94110
Permit history
-
Nov 2016
Soft story retrofit per sfbc chapter 34b engineering criteria 2012 iebc appendix a-4.
-
May 2008
To legal establish new occupancy 6-bed residential care on 1st floor @ three units. comply with nov #200232113 - re-install kitchens for two units on 1st floor(middle floor) & replace bathtubs by showers @ two units. re-install entrance door @ one unit. remove ground floor non-conforming entrance door.
-
Apr 2008
Convert building back to original use as 6 unit apartment building. previous permit application 2002-0913-6413 os cancelled. comply with nov# 200232113.
-
Sep 2005
Fire sprinkler the entire structure.
-
Sep 2002
Convert existing 6 dwelling units on two floors into a mentally-ill residential care facility (adult) for 22 and/ or fewer (legalization).
-
Sep 1990
Reroofing.
1 nominal $1 street-space permit is omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.