3338 23rd Street
Mission · San Francisco, CA 94110
Permit history
-
Apr 2026
Reroofing hot works.
-
Oct 2024
Remove shingles from front, replace with wood horizontal siding.
-
Mar 2022
Partial bathroom remodel, new tub with shower. new tile work. no alteration of wall, window and door.
-
Aug 2017
Unit a: install new heating system with gas furnace located in attic for upper unit.
-
Jul 2014
Revision to original permit # 2014-0515-5864. design change to fence post layout and framing.
-
May 2014
10' fence at rear yard. electrical circuit for spa/jacuzzi.
-
Nov 2011
2nd floor interior remodel. upgrade existing bathroom, kitchen and walk-in closet. replace 3 swing doors with pocket doors.
-
Oct 2009
To obtain final inspection for work approved under 200707166809; all work is complete.
-
May 2009
Renew permit application 2008/03/03/6150 to obtain final inspection. all work has been completed.
-
Mar 2008
Installation of floor, walls, cabinetry and a half bath on ground floor. inserting 9 small window & 1 20"x46" window.
-
Jul 2007
Voluntery seismic upgrade to existing foundation. install 5/8 threded rod every4' no less than 12" from plate ends min 7" embedment. 1/2 1 ply nailed 4" edge 8" feild.
-
Jun 2002
Sheetrock existing walls in garage. no walls will be added or removed. add 2 doors(fireratd). type o.
-
Oct 1997
Reroofing.
-
Aug 1985
Removal of stove, refrigirator.
-
May 1984
Legalize apartment in 1st story.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.