3542 23rd Street
Mission · San Francisco, CA 94110
Permit history
-
Jun 2025
As built 202505015627 addition of 1 heat detector.
-
Jun 2025
Four units: partial insulation and patch/repair sheetrock-mud/tape/sand prime+ paint following electrical work.
-
May 2025
Full 1103.6.7.1 fire alarm upgrade to add low frequency sounders to all sleeping areas, full addressable system upgrade.
-
Jul 2024
To obtain final inspection for work approved under permit 201602058996. all work is complete.
-
Feb 2016
Replace (18) front street facade windows with fiberglass, single - or double-hung with horizontal sash. prep and paint full exterior around, no change to exterior siding (stucco). repair dry rot trims (minimal only as needed) with wood trim.
-
Jul 1988
Reroofing.
-
Sep 1985
To bring into code.
1 nominal $1 street-space permit is omitted.