3779–3781 25th Street
Mission · San Francisco, CA 94110
Permit history
-
Apr 2026
The scope of work includes an interior remodel of one unit at second floor level; kitchen and existing bath reconfiguration; and a new en suite bath serving the primary bedroom.
-
Jun 2025
Kitchen and bath remodel with removal and replacement of all fixtures. add new master bathroom with existing footprint, create new closet in bedroom and add new opening to hallway.
-
Nov 2024
Reroofing with torch down.
-
Jun 2011
Revision to permit 201105276967; remove existing cracked and degrated conc slab in basement storage area and replace with new conc. slab, new conc slab, 3-1/2" thk with 6x6 mesh, 6 mil polypropylene, abt 10 ft wide by 30 ft deep.
-
May 2011
Moisture condition in basement. remove surface carpet and apply waterproofing concrete layer over the existing slab. possiblly use xypax concrete.
-
Jan 2011
Repair/replace minor damage due to rot @ rear deck, (less than 50% repair).
-
Mar 1995
Renew 9210902.
-
Jul 1992
Bring building. into compliance with hid report dtd 05/29/91.
-
Jul 1989
Vertical addition.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Know any of it? Tell us — just describe it in plain words.