18–20 Adair Street
Mission · San Francisco, CA 94103
Permit history
-
Aug 2018
Revision to pa 2018-0807-6591, replace existing windows in bathroom with windows of the same size in the same location. new skylight in hallway.
-
Aug 2018
Remodel existing kitchen & bathroom, partial interior remodel including new bathroom fixtures, appliances, services and finishes and new kitchen case work, fixtures, appliances, services & finishes, replace windows at rear.
-
Sep 2016
To comply with physical inspection report # cc-7851.
-
Aug 2016
Reroofing.
-
Jun 2014
Remodel bathroom in-kind except replace tub with shower stall. replace sink, counter, tile floor, medicine cabinet. no movement of walls or door. remodel kitchen, replace in-kind floors, cabinets, sink, light. replace sub floor in laundry room with redwood & 3/4" plywood.
-
May 2014
To obtain final inspection for work approved under permit application 200308283334; all work is complete.
-
May 2014
To comply with nov #200342373. no work visible to street. replacement of windows (wood single hung) single glaze with vinyl double glaze single hung-bedroom/bath & upstairs dining room. in basement replace 2 48" section of 2"x8" beam damged by dry rot over the water heaters. final inspection of back.
-
Mar 2004
To renw permit application 2003/08/28/3334 for final insp.
-
Aug 2003
Repair & replace rear stairs and landing to comply with n.o.v. complaint #200342373.
-
Sep 1996
Remvoe and replace walls and ceilings in 2 bedrms & hallway.
-
Feb 1989
Reroofing.
-
Mar 1982
Additions alterations or repairs.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.