2001 Bryant Street
Mission · San Francisco, CA 94110
-
1943
Built as an industrial building, recorded as occupied by Enterprise Engine & Foundry Co.
-
Aug 1991
Reroofing.
-
Aug 1991
1/2" fiber board over space sheeting.
-
May 1997
Int tenant improv/new storefront entry/path of travel upgrad.
-
Jul 1997
Correct permit application 9709039 with wrong const type fr 3 to 4/metal studs.
-
Oct 1997
Awning.
-
Oct 1997
Sign.
-
Jul 1999
Install walk-in cooler, add electrical panel, 2 fire sprink heads.
-
Feb 2005
Installing sprinkler monitoring system in existing building and tennant, 1st floor.
-
Mar 2013
Install 2 illuminated single faced wall signs.
-
Sep 2014
Construct 1 story room interior within existing interior open area, 817 sq ft. install wire & secure 3 new cnc machines to existing cone, floor, construct new partition walls to create 4 new offices, modify existing electrical & mechanical systems for new areas. maher not required.
-
Apr 2015
New window openings on the west & south elevations to match existing. n/a ordinance #155-13.
-
May 2015
Existing 2nd floor to be extended into existing double height space. addition of offices and new stair. n/a for the maher ordinance.
-
Jun 2015
Ti of fire sprinkler system add and recalculate 8 pendent sprinklers per new shop. n/a for maher.
-
Nov 2018
Improvements for production of food based product. no mechanical assembly line production of canned or bottled goods. no chemical processing. no mechine exceeding 5 hp capacity mechanical equip pws related floor space 19% of total lease area maher not req.
-
Jan 2019
Soft demolition. for t.i.
-
Nov 2019
Fire sprinklers: add 77 & relocate 40 pendent heads for new wall layout. ref permit application 201811024890.
-
Dec 2019
Revision to permit application 2018-1102-4890 & 2019-1016-4557: construction revision 02.
-
Feb 2020
Ref permit app# 2018-1102-4890: installation of a fire alarm system associated with the "whole biome" remodel on floor 1; the additions onto the panel are/ smoke detector/ 1 pull station.2 duct detectors, 4 modules, 1 display annunciator, 36 speaker/strobes. and 1 strobe.
-
Mar 2020
Final electrical revisions to permit application 201910164557.
-
Mar 2020
Mezzanine - fire alarm permit #2 for the "whole biome" remodel; these drawings add 1 duct detector and 2 relay modules, as well as correcting the locations of 2 duct detectors shown on initial #1 ref pa 2018-1102-4890.
-
Oct 2020
Provide and install a main switchboard for pg&e upgrade.
-
Oct 2020
Fire sprinkler as built to #2019-1108-6785. bracing location only changed on as built.
-
Jun 2022
Install steam generator and water heater.
-
Feb 2023
Installation and anchorage of a 1, 500 gallon liquid nitrogen tank & vaporizer on a pre-cast concrete pad.there are no changes in parking or floor area.
DBI holds 29 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 29. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update