Permit history
-
Aug 2023
Dry rot repair at exterior siding. minimal anticipated repairs - 3 or 4 locations. partial painting at sides and rear. no work at front of building.
-
May 2019
Studio remodel new kitchen and bath remodel. new electrical and lighting. new windows in existing openings maher not req.
-
Jun 2017
Add 811-a capp st to 3642/062 for the rear building. ref appl# 2015-04-30-5015 & 2017-06-02-8314.
-
Jun 2017
Revision to 201504305015 for recording purposes oly, clarify unit count is 2 dwellings after gr floor converted to dwelling unit.
-
Oct 2015
Revision to 201210172213(r-3), sht s1-revised footing detail #3, added hdu2(1)move hud 8, sht s4-revise detail 5 to show 12"embedment for hdu2 holddown into existing footing, sht s5-revised shear moved window.
-
Aug 2015
To complete work and to obtain final inspection for work approved under permit application 201109154679.
-
Apr 2015
Convert workspace to dwelling unit. add kitchen & shower. add (3) fire rated 45min fixed windows (2) 5-0 x 4-o h (1) 2-043-0h.
-
Mar 2014
New 3'-0" x 6'-8" side door/frame. repair back stairs per complaint # 201454941. stairs have wood deterioration. support post, support brackets, select treads/risers. repair area less than 50%. repair door trim to side door and siding repair. no changes to windows. maintain egress.
-
Oct 2012
To comply nov#201170833 reference permit application 2011-09-15-4679. revise building 2 ft by sistering new studs to existing studs. add shear wall per drawings.
-
Sep 2011
Rear structure - remove dry rot @ bottom of perimeter walls, install new 6" concrete curb, new 2x6 wall framing attached to existing perimeter studs, new 1/2 bathroom, new work sink, washer/dryer.
-
Sep 2009
Remodel 809 & 809a: change interior wall locations, new spread footings, new electrical, widen stairs. new upstairs bathroom @ one unit. vault ceiling @ one unit.
-
Jul 2009
Remodel 2 kitchen - new cabinets tile floor, countertops & 2 bathroom - new plumbing fixtures, tile @ floor/shower walls. work performed on two units-a only. no wall relocation or removed.