226 Clinton Park
Mission · San Francisco, CA 94103
Permit history
-
May 2026
Like for like replacement of e) deck, wood board and stais on the 1st/f. no work on 2nd/f.
-
Aug 2021
Reroofing.
-
Feb 2014
Remove damaged concrete slab/driveway between garage & sidewalk, partial removal of concrete slab btwn garage door & existing floor drain (approx 200 sq ft.). install driveway concrete channel drain in front of garage door, connect to existing floor drain. install new concrete slab, pitched toward drains.
-
Oct 2004
Kitchen and bathroom remodel - replacement of two windows.
-
Jul 2003
Repair floor in upstairs bath, replace tiles, sheetrock bdrm ceiling, remove cracked plaster, gravit.
-
Jul 2003
Electrical: new service, wiring, upgrade. replace sheetrock for above (1 kitchen wall) 2 windows. retrofi.