1275–1277 Dolores Street
Mission · San Francisco, CA 94110
Permit history
-
Jul 2023
Kitchen: replace existing cabinets with new. replace countertops. new cabinets around stove. bathroom: replace sink, bathtub, tiles around shower. bathroom & kitchen: replace electrical outlets with gfci outlets. bathroom: replace sink faucet with a flow rate of 2.2 gpm & shower head with 2.5gpm. no.
-
Apr 2015
Replace 13 stair treads and approximately 30 square feet of 1x4 boards at landing due to dry rot. this repair is equal to approximately 15% of the stair structure. repaired/replaced material will match existing exactly.
-
Aug 2005
Reroofing.
-
Feb 1995
Replace exterior front steps & risers.
-
Nov 1993
Replace existing stairs to plan specific repair existing entry stairs.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.