Permit history
-
Jun 1989
Enclose 2stair wells on 1/f & 2/f with 1-hr construction.
-
Jul 1996
Install a complete automatic fire sprinkler system.
-
Mar 2001
Two exit door and stair @ first floor new ramp @ first floor repair ramp at drive to comply with cod.
-
Nov 2003
To erect temporary classrooms.
-
Jan 2007
Exterior renovations to day school building, including paths of travel new building entry; removal of existing fire escape and replacement of windows & doors on facade. interior work under separate permit.
-
Jan 2007
Interior t.i. for 3 floors of school. work includes new bathrooms, new elevator, new partitions, new lighting & mechanical. exterior work including new entry & level landing under seperate permit. fire protection udner seperate permit.
-
Jun 2007
Interior soft demolition in advance og t.i, permits under review: 200701262709, 200701242501 for interior and exterior t.i. no exterior work under this permit, no construction under this permit, no structural work.
-
Feb 2008
Revision to permit application 200701262709-changes at 3rd floor only. new shear walls and partitions for classrooms and hallway. new sinks at classrooms. no exterior work.
-
Aug 2008
Add 58 sprinklers from old, demolished system.
-
Apr 2009
Renew permit application 2007/01/24/2501 to complete work & obtain final inspection.
-
Jun 2009
Windows replacement - 38 existing single pane, wood casement windows, repalced in-kind with new double pane wood units wihtin exisitng frames. clear openings to remain the same size.
-
Jul 2009
To complete work and obtain final inspection for work approved under permit application 200701262709.
-
Jun 2012
Reference approve permit application 201201051756 (450 guerrero) to include new stair and include lift.
-
May 2016
Revision to appl #2007-0124-2501 r1. exterior improvements to buildings exterior. work include accessibility, entrances and path of travel upgrades. remove existing fire escape. existing retrofit windows and doors will be replaced with units to match original. no change of use or addition of floor area.
-
Jun 2016
Sfbc ord. 3428.5 private sch seismic retrofit, all deficiencies corrected, interior ti to upgrade accessibility and life safety. installation of 2 interior exit access stairs dedicated to the 1st and 2nd fl only, misc egress and life safety upgrades to existing concrete framed building.
-
Aug 2018
Fire alarm ti ref permit application 201606160157 39 new initiating devices, 12 notification appliances for ti based on 2001 and historic building code.
-
Sep 2018
As-built revision to permit application 2018-0802-6211 - fire alarm system ti to accomodate a new elevator upgrade.
-
Sep 2022
Erect a 1 story preschool building, no dwelling, no basement.type -v.
-
Jan 2023
Demolition of three (3) existing portable buildings and other miscellaneous site elements in preparation for a new construction project. no work at the existing st. joseph's hall building.
-
Jul 2023
Install new fire alarm.
-
Jul 2023
Install new elevator two-way.
-
Oct 2023
Install new 4" fire sprinkler in building riser.
-
Dec 2023
Install new 4" fire sprinkler in building riser.
-
Jan 2024
Revision to permit application 202312082230, add more pipe to underground connection.
-
Aug 2024
Revision to permit application 202209071941, as-built fire alarm.
DBI holds 54 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 54.