565–569 Dolores Street
Mission · San Francisco, CA 94110
Permit history
-
Aug 2019
Reroofing.
-
May 2018
Soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4.
-
Feb 2018
Replace dry rot lomber on deck and stair at rear side. less than 50% replacement.
-
Sep 2010
Install plexiglass at back door and windows. install wire mesh over back windows to comply nov# 201054653 item 8, 4 doors & 6 windows.
-
Jul 2010
Replace dry-rot lumber & damaged framing & decking to the rear exterior stairway, less than 50%.
-
Aug 2002
Repairs to deck, remodel dry rot and replacement of lumber, handrail on deck, shtrk, repair front door.
-
Jun 1994
Repair or replace rotted phone has beam at front of building.
-
Feb 1993
Remove/replace.damaged sect.exist.nonstruc.timber box ber.frame.
-
Oct 1990
Reroofing.
-
Sep 1988
Rebuild back stairway.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Know any of it? Tell us — just describe it in plain words.