153–155 Duboce Avenue
Mission · San Francisco, CA 94103
Permit history
-
Jul 2024
Renovate 4 full bathrooms like for like including replacing & repairing tile, toilet & vanity. replace 6 upper unit street facing windows (al-cl-wd).
-
Jul 2024
Create of a state adu(153a duboce ave)by dedicating the 1st story of current 2 story unit to an adu.create distinct entry to new adu, from 2nd story main entry.
-
May 2024
Kitchen remodel two units duboce street. enlarged door opening and add sink for both units.
-
Jan 2013
Ground floor improvement. new interior stair from 2nd to 1st floor. add 3 new bedrooms, 2 new baths, connecting to 1st floor rear storage and converting to habitable space.
-
Nov 2012
2nd & 3rd floors-interior remodel-adding 1 bathroom on 2nd floor & adding 1 bathroom on 3rd floor.
-
Nov 2002
Install "36 door (interior). 1 hour pated door between units in existing door way.
-
Sep 2002
Remove existing tile floor & wall in bathroom install newinsulation, water proof floor, install building paper.
-
Jul 2002
Install 2 metal handrail in garden area (rear)on stairs, handrail is above step.
-
Jan 2001
Street space.
-
Sep 2000
Repair rear stairs, repair in kind, reinstall hot tub, outlet rear yard, repair sidewalk, additional.
-
Sep 2000
Street space.
-
May 2000
Replacement of windows in kind.
-
May 2000
Increase est. cost 3, 000 under orig appl #9927009.
-
Sep 1999
Reroofing.
-
Mar 1999
Add dedicate 220/60a gfci for tub (hot) on existing deck.
-
Sep 1997
Replace wood retaining wall at rear of property line with concr.
-
Sep 1996
Renewl permit application #9600692 for final inspection.
-
Jan 1996
Kitchen remodel.
-
Jan 1996
Remodel kitchen on lower unit.
-
Dec 1995
Install plywood panels on lowest level perimeter walls.
-
Jul 1991
Reroofing.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.