79 Elgin Park
Mission · San Francisco, CA 94103
Permit history
-
Aug 1987
Replace staifrs.
-
Oct 1993
Replace aluminum framed, dual glazed windows.
-
Aug 1996
Reroofing.
-
Apr 1998
Remove dry rotten stairs to roof.
-
Jun 1998
To rebuild existing rotten stairs at upper two levels.
-
Mar 2003
Repair in kind. 2 stringer out of extng 8 back staircase. 10 treads out of 44.
-
Jan 2004
Condo conversion per 3r-4016.
-
Feb 2004
Renew for 200303190159 for final inspection.
-
Mar 2004
Renew app #9614936/9806273/9811566.
-
Nov 2017
Replace rear 3 existing double hung wood windows in kind with marvin al.clad wood windows, same size and configuration. u fact <.32.
-
Mar 2019
Full kitchen remodeling in kind, no structural work involved 100 sq ft no walls are being modified.