73 Erie Street
Mission · San Francisco, CA 94103
-
1953
Built as an industrial building, wood frame construction, associated with G.W. Thomas Drayage Co.
-
Sep 2021
Repair damaged asphalt and stripe for fleet vehicle storage.
-
Oct 2022
Install 13 ev charges for 26 vehicles convert from vehicle storage lot to fleet charging use.
-
Jan 2025
Revision to permit# 202210194663: added utility trench detail, updated erovsion control notes, added fence and gate detail.
-
May 2025
Revision to 202210194663 & 202501299316. updated utility connection, relocation of existing temporary lights/ install permanent lights, update of electrical equipment locations, add lota devices.
-
Jun 2025
The scope of work includes a proposed type v, 1 story pre-fabricated trailer by others- plan approval #mac-cm 10067 along with associated flatwork. flatwork improvements including grading of onsite concrete and asphalt areas surrounding the building & the accessible paths of travel from.
-
Jul 2025
New generator and associated wiring to support the project operation during power outrage. work inches new 100kw standby back up generator.
The survey's data table dates the building to 1953; the context statement's appendix dates it to 1923. Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update