119–121 Fair Oaks Street
Mission · San Francisco, CA 94110
Permit history
-
Jun 2026
Administrative pa to clarify thay the work performed & completed under 200304091891 & 200304112054 was for the front building at 119-121 fair oaks, and not the rear building at 121a fair oaks. no work under this permit.
-
Jun 2025
Remodel the existing common bathroom to add enclosed washer and dryer relocate existing door a per plan.
-
Jul 2023
Reroofing.
-
May 2017
One bathroom remodel like for like. replace plumbing fixtures and lighting. no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5.
-
Jan 2004
Condo conversion 2 major jobs and minor major = replace steps and deck front and back and common.
-
May 2003
Detail footing foundation.
-
Apr 2003
Remodel kitchen & bathroom and lower unit.
-
Apr 2003
Add rooms at ground floor *exercise rm and h alf bath).
-
Feb 2003
Install 5 vinyl windows in kind into extng frames, no change in size or locat.
-
Jun 1998
Reroofing.
-
Dec 1997
Remodel kitchen & bath.
-
Mar 1997
Repair rotted guard rail at rear deck siding front.
-
Dec 1996
New recessed lighting paint, tile floor at bath & kitchen.
-
Nov 1996
Renew expired appl #9603694.
-
May 1996
Reroofing.
-
Mar 1996
Window replacement, tile floor in bath & kitchen, lighting.
-
Jan 1996
Foundation work to be done according to plans.
-
Sep 1988
Repair base of wall, repair siding, repair steps.
-
Feb 1984
Repair of rear building.
1 nominal $1 street-space permit is omitted.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Know any of it? Tell us — just describe it in plain words.