167–173 Fair Oaks Street
Mission · San Francisco, CA 94110
Permit history
-
Sep 2025
One unit: remodel in kind kitchen and bathroom all electrical and plumbing as needed.
-
Aug 2024
Voluntary strengthening at foundation - new concrete foundation footings cast against existing brick foundation at corners of outer building perimeter and inner building courtyard. new collector elements at g/f framing.
-
May 2024
Fire alarm system replacement and new low frequency horns to meet sffc 2022 section 1103.7.6.1.
-
May 2024
Remodel 1 kitchen, 1 bathroom, electrical as needed. one unit.
-
May 2024
One unit. remodel two bathrooms in kind. remove tub and install shower, replace toilets, sinks, all plumbing as needed.
-
Nov 2023
To comply with nov# 201577411: replace (6) windows in rear of building. not visble from street - like for like windows. u=.30.
-
May 2019
One unit: kitchen and bathroom remodel.. to comply with complaint #201577411. legalize replacement of 6 windows at the rear of building. same size, same location. max u factor 0.32.
-
Nov 2015
Comply n.o.v. 201577411. replace 12 windows at rear of building min u=factor 0.32.
-
Apr 2014
Revision to permit application 201306273196. correct address.
-
Mar 2013
Interior remodel at one unit. add a bathroom and study room.
-
Dec 2012
Revision to existing permit application 201204027383 per field inspector comments. 1. revision wall detail at skylight. rise floor at proposed bathroom.
-
May 2012
Correct and add value $13, 000 from application # 201201192569. change two window in court yard.
-
Apr 2012
Interior remodel: one unit. convert portion of existing living room into bedroom, add new bathroom, enlarge existing study room. one unit: remove existing pantry remodel existing kitchen. remodel existing bathroom, add new bathroom.
-
Jan 2012
#2 - remodel bathroom & kitchen. no structural work.
-
Feb 2011
Nov 20100493 dated 11/30/10 and 201074287 dated 10/22/10. replace dry rot damaged exterior trim. all work in-kind.
-
Sep 2008
Revision to permit application 2008/09/08/0975. dry rot 12 steps & risers. repair like in kind. 3 stringers @ front. replace 1 window like in kind.
-
Sep 2008
Repair first, second step @ front 2 steps dry rot repair. repair roof cover at rear yared stairway. repair 1 window at front of house glazah only.
-
Feb 1998
Remove & replace existingrailings at front entry stair with new redwood.
-
Feb 1998
Remove and replace existing front entry stair with new wood.
-
Jan 1995
Reroofing.
-
Dec 1994
Reroofing.
-
Jul 1991
Repair drykrotted, treads, & handrail on front stairs.