Permit history
-
Oct 1984
Sign.
-
Aug 1989
Bracing of brick parapet.
-
Apr 1993
Reroofing of exist corrugated iron roof with asphalt shingles.
-
Jul 1997
Int renovation existing restrooms/extendexistingmezzanine/new int offi.
-
Feb 1998
Erect 7 electric sign.
-
Jul 1999
New auto spray paint booth in exist auto body shop-gas & pwr.
-
Feb 2001
Seismic retrofit for umb compliance fora risk level 3 building general procedure.
-
Apr 2002
Non-bering gyp.bd. partn. at rear of build. add two interior offices, electrical/ mechan.separate permit.
-
Jul 2002
Install new class a built-up roof (not a reroofing) & shingle roofing. attach plywood underlayment.
-
Jul 2002
Revs to approvd permit no 200204164027-new mezz added & toilet facility expansion, revs to include a.
-
Oct 2002
Rev.appl#9712712 demolition a portion of existingpart's dept. & construct 2 new private offices.
-
Nov 2002
Install 18 flat skylights at the roof per p/a 9712712.
-
May 2010
Mercedez benz. remove and replace existing auotomatic lifts and equipment. provide new concrete work to support new lifts.
-
Jun 2010
Mercedes benz. renovate existing interior offices and restrooms incl. new paint, interior doors, floor finishes, cabinetry and lighting.
-
Aug 2010
Install ul 142 approved, double wall above ground storage tanks; -install automotive exhaust duct, fans are existing; -overhead reels; relocating 3 oil tanks exisitng; steel support beams on separate permit.
-
Oct 2021
Conversion of ext single story + or - 40000 sq ft automotive repair building to trade shop with accessory parking and storage. all associated ti fit out.
-
Feb 2022
Fire sprinkler system. 348 sprinklers. underground under separate permit.
-
Apr 2022
New mezzanine and ada compliant bathrooms- mep to follow.
-
Apr 2022
New ada restrooms in existing automotive use space. new 1-hr rated exit corridor. demolition existing restrooms and office space. no change of use under this permit.
-
Jul 2022
1st floor: mep deferred submittal to support approved arch drawing 202110251080. new mechanical systems and fans.
-
Jul 2022
Provide new dedicated function system. add (1) dedicated functioin control unit, (1) lcd text amunicatior, (23) high power control relays, (2) single input modules, (1) dual input modules, (1) pull station, (7) storbe detectors, (20) duct smoke detectors. building permit application 202111251080.
-
Aug 2022
T.i. to existing fire sprinkler system. 128 f/s. t.i. pa202110251080.
-
Sep 2022
Revision to bpa#202210251080 to provide new egress to 11th street.
-
Oct 2022
Addition of exterior mechanical platform and security gate in private alley. structural drawings and calcs included.
-
Feb 2023
Addition of exterior metal panels.
DBI holds 39 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 39. 1 of them are nominal $1 street-space or sidewalk permits.