2011–2013 Folsom Street
Mission · San Francisco, CA 94110
-
1907
Built as the Wagner Hotel, a single-room-occupancy hotel with commercial space at street level, of a type built for single working men.
-
Aug 1986
Horizontal addition, install fire escape at existing hotel.
-
Jul 1993
Remodel counter tops paint floor tile donut showcase.
-
Apr 1994
New roll up door, front windows, ramper driveway.
-
Aug 2001
Install new fire sprinkler system.
-
Oct 2003
Install fire sprinkler system to comply with ordinance #170-02.
-
Jul 2008
Change of use to gr floor coffee shop: interior improvments for a coffee shop at ground level. create outdoor seating area, indoor seating area/ retail counter, computer area, prep area.
-
Jul 2008
Provide interior improvement for a coffee shop at ground level.
-
Oct 2008
Fabricate and install awning approximately 37' long by 4' high at front of ground floor for new coffee shop.
-
Oct 2012
Minor repair to comply with nov 201234101, 201234001, pid 201297793. concrete patch replacement at furnace room roof. fire wrap on ceiling of furnace room. repair lightwell roof leaks, attach e flue straps to building. cut down rear fence to less than 6ft.
-
Feb 2014
Comply with nov# 201297793 & 201234101, tradesman breezeway repalce 4"& 2" plumbing pipe, repair leak & center lightwell instlal correct size dhood duct pipe, sprinkler ppipe leak repair, installation of protection & steam pipe for stove electrical oven.
-
Sep 2014
To erect non-electric, wall, single-faced sign. ** maher: compliance with ordinance no# 155-13 not required **.
-
May 2015
Soft story: (2)new steel frames, new foundation, steel collectors, carpentry & finishes.
-
Feb 2017
To comply with notice of violation #201465801: install grab bars in common area water closets lavatories and bath facilities to comply with ordinance 4 shower, 6 water closets.
-
Mar 2019
To comply with n.o.v 201809741. repair existing damange store front entrance.
-
May 2019
20% rule of ada expending for the seismic retrofit of soft story building under 201809180707.
-
Jul 2019
Demolition ground floor interior fixtures and walls partition.no change to store front or use.
-
Aug 2019
Tenant improvement of existing restaurant, new tenant (bakery) storefront, new kitchen, restrooms, mep included.
-
Aug 2019
Withdrawn.
-
Dec 2019
Rev: to permit application 201908078156; updated exterior storefront design previously approved uner 201908078156.
-
Sep 2020
Upgrade existing kitchen fire suppression system. ansul r102 for the restaurant.
-
Jan 2021
Install handrail from ground floor to 2nd floor at entrance staircase.
-
Feb 2021
Revision to app#201908078156. changes to mechanical specifications and layout.
-
Sep 2022
Conversion of existing tool room 69 sq ft to new staff rest room with in existing building foot print second fl. scope of work install new sink, toilet, fl fl motied mop sink, finishes no exterior work no residential guest rooms are being remoded or converted.
-
Jun 2023
Replace fire alarm with notification to comply with sffc 1103.7.6.1, relace e facp with new fire alarm control unit. install new rmote power supply, aes radio comm, monitoring modukes to monitor aes radio, ansul system, waterflow and tamper switch, new horn strobes, wall strobes, lf sounders to be.
-
Feb 2025
Install 1/4 dry wall in common area only in walls only cover old plaster 14, 080 sq ft.
DBI holds 46 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 46. 7 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update