Permit history
-
Jan 1982
Additions alterations or repairs.
-
Feb 1982
Additions alterations or repairs.
-
Nov 1984
Install cabinets & divider/all doors & windows.
-
Jun 1985
Convent existing warehouse space luch area and employee.
-
Mar 1986
Addition of interior office space including.
-
Aug 1995
Erect a one story equipment/storage building.
-
Nov 1995
Rev. permit application 9513014. substitute conc block for exterior walls.
-
Mar 1996
Install fire suppression system.
-
Jul 1997
Drill hole install cage & bolts/pour concrete.
-
Oct 1999
Comply with nov-9901213 provide parking, curb &sidewalk cuts.
-
Nov 1999
One stop: remodel existing building. for tv & signal equipment.
-
Feb 2002
Add sprinkler heads at drop celing (70 heads 1st floor/76 heads 2nd fl.
-
Dec 2002
Rev to 9924431; slight modification to existingstorage rm & add 2 new single pole switches; 4 receptcles.
-
Apr 2004
Install d/c power plant containment & ventilation.rev.appl#9924431.
-
May 2004
Oti-1 1st & 2nd floor, ls, me, ls.
-
Jul 2004
Install of standby generator with 50 gallon belly.
-
Dec 2006
1st & 2nd floors-modify existing mechanical, electrical systems to accomodate new office. relocate existing lights as part of code upgrade. refer to permit application 200405053065.
-
Nov 2008
1st & 2nd floors-install fire sprinkler monitoring system and notification.
-
Oct 2014
Replace existing power plant with a new model. replace existing battery string with a new model avr 125-33, 6.6gal, 73.92 lb, 29.55 pure acid. n/a for maher.
-
Feb 2015
Relocation of existing clean agent tank, existing equipment only, no new equipment. original installation permit# 9604542. n/a ordinance #155-13.
-
May 2017
Reroofing.
-
May 2024
Non-residentail electrical upgrades to an existing (utility building) wireles telecommunications service facility. removal of asphalt paing, minor soil removal at equipment pads, new conc equip pad, and electrical equipment. no additional floor area proposed.
-
Sep 2024
Install one (1) new 400a, 277/480v, 3ph, 42 service pedestral with 600a, 120/208v, 3ph, 4w distribution section. install one (1) new 150kva transformers 480v-120/208v. install ten (10) new liteon l2 ev se chargers on five (5) dual pedestral system. l2 evse.
-
Nov 2024
Demolish and replace packaged ac units. relocate exhaust fan.
DBI holds 43 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 43.