42–44 Gough Street
Mission · San Francisco, CA 94103
-
Jul 1982
Building use: office & shop.
-
Oct 1982
Building use: offices.
-
Jan 1983
Sprinkler system.
-
Mar 1983
Additions alterations or repairs.
-
May 1990
Cti1.
-
May 1990
Cti1.
-
May 1990
Cti1.
-
Sep 1990
Fire suppresion system in first fl computer room.
-
May 1994
Parapet.
-
Jan 1995
Cti 1 1st floor el me sp.
-
Jan 1995
Cti 2 1st floor el me sp.
-
Jan 1995
New support beam & columns for new folding door.
-
May 1996
Construct wall.
-
Jun 1996
Handrail for front stairs, visual strips.
-
Sep 1997
Replace main entrance door for ada fr 20 1/2" to 32" opening.
-
Jan 2005
Repair main gate on brady 13'5 x 6' cyclone, repair maingate on stevenson 42'x6 cyclone, 49'on colto.
-
Jun 2009
Install 16' long by 5.5' high iron rod fence, and 3' wide by 5.5' high gate with side panel for landscape/planter box at front of the building. fence not affecting the entrance.
-
Jul 2009
Re-stucco about 40 feet - 30 inches at rear of building. match existing stucco.
-
Aug 2009
Change of use from off to new meditation/relig center. new windows, new kitchenette, new closet, new ramp on 2nd floor. add bollards to rear grnd floor exit (exterior); revmove ext. gate; add panic hardware as per plans; add occ load signs as per plans; . sprink and f/a on sep per plans.
-
Nov 2009
Tenant improvement including 1 new unisex restroom and kitchenette/lunch box.
-
Dec 2009
Relocate, add (8) sprinkler heads.
-
Mar 2011
Tenant improvement with new finishes. replace existing window with sliding glass door. new entry door.
-
Jun 2011
Install 4 new windows at 3rd floor. upgrade path of travel at suite.
-
2014
Offices of the Bay Area Reporter, suite 204, from July 2014.
-
Oct 2014
Reroofing.
DBI holds 34 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 34. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update