1330–1336 Guerrero Street
Mission · San Francisco, CA 94110
Permit history
-
Jul 2026
Add bathroom where existing laundry room is. 3rd floor.
-
Mar 2026
One unit: convert existing pantry into a three-quarter bathroom.
-
Aug 2025
1336a guerrero st - converting pantry area into full bathroom.
-
Aug 2024
Bathroom remodel to include replacing bathtub and tiles. rewiring old knob and tube subpanel.
-
Feb 2022
To obtain a final inspection for work approved under previous permit 200801041851. all work is complete.
-
Feb 2022
Recommencement and completion of work approved under previous permit #200708291215. 40% of work remaining.
-
Feb 2022
To obtain a final inspection for work approved under prevoius permit application 200805303233. all work is complete.
-
Dec 2021
Patch drywall. removing old trim around where a door used to be.
-
Feb 2021
Remove non-structural wall between living room and kitchen.
-
Nov 2019
Repair and replace 50 sq ft of cracking lath and plaster with sheetrock. within unit inside room.
-
Oct 2019
Repair dry rot in south west corner of the building on siding approx area 2 sq ft. no structural work.
-
Jun 2019
Bathroom tiles around bathtub replacement. replace sink. approximately 6' x 9'.
-
May 2019
Removing non-structural wall between living room & kitchen.
-
May 2019
Reroofing.
-
Mar 2019
Revision to soft story permit 201708165051.
-
Aug 2017
Soft story: upgrade per sfebc chapter 4d, design criteria from 2016 iebc appendix a-4.
-
May 2008
Remodel kitchen and bathroom, flouresent lights in kitchen and bathroom. no structural work.
-
Jan 2008
Revision to permit application 2007/09/26/3766 to change configuration of proposed bathroom in one unit on the 1st floor.
-
Dec 2007
To comply with notice of violation complaint#200728530. repair side stairs, electreical, plumbing per complaint.
-
Sep 2007
Removal of non-bearing walls and infill. remodel and enlarge bathroom at kitchen area. no structural work. all work under this permit to be done in one unit.
-
Aug 2007
Change coutnertop, install new cabinets, refinish or install new flooring, install tile, change sink, change toilets, change shower heads, new vinyl floors. no structural work. total 6 kitchens & 6 bathrooms.
-
Jun 1998
Repair roof cracks bitumen cold process.
-
Oct 1985
Removal of old bath tub.
-
May 1985
To bring building into ffll coompliance with the provisions.
5 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.