194–198 Guerrero Street
Mission · San Francisco, CA 94103
Permit history
-
Jul 2025
Upgrade existing west wall to 1 hour fire rated construction. replace windows and doors on west well with 1 hr fr units.
-
May 2025
Demolition of existing 1-story, type 5b storage/ garage accessory structure in the rear yard. site permit under permit application 202408158748.
-
May 2025
Replacement of sub standard exterior grease ducting per plan replace by 16" x 16" 16 gauge minimum galvanized steel ducting per cbc 11b-202.4 exemption 7 - exempt project from access compliance.
-
Mar 2025
Relocated previously approved (p/a 2022-0912-2284) floor beam from a fully "dropped" to a flush at the top condition.
-
Dec 2024
Erect 4-story, type v-a, 2-family residential building, r3, no basement.
-
Aug 2023
Administrative process to document number of unit count for existing building resulting from records review and site verification for 3r report dispute. no proposed work under this permit.
-
Feb 2023
To comply with accessible entrance program per ordinance 51-16, abe#201812313694.
-
Oct 2022
Change existing awning non electrical and non illuminated sign(mezze and mooore).
-
Sep 2022
One unit: kitchen & bathroom remodel, revise floor plan, work in this unit only.replacement of existing & (s) elevation windows @ 3rd floor with aluminum clad wood windows (total 12).
-
Dec 2019
Comply with his nov #201993081 & 201927064. general maintenance.
-
Nov 2019
Rev to permit application 201904178185; to comply with complaint 20993361; crating a means of egress rebuilding existing stair.
-
Sep 2019
Revision to bpa #201904178185. administrative permit to correct address: one unit =196. one unit = 194.
-
Apr 2019
Interior alt of 2 dwelling units in mixed-use building. 1st unit kitchen & bath remodel, add 1 bath, newlndry, new hvac. 2nd unit kitchen remodel, relocate bath, new wh. revise floor plans.replace reviseexisting egress stair to minimum required code landings. no work to 3rd dwelling unit or 2 commercial units.
-
Feb 2019
Install 1 illuminated double-faced projecting sing for "love shack".
-
Aug 2018
To obtain a final inspection for work approved under permit application 201206203049.
-
Mar 2018
Change of use. change from medical cannabis dispensary to cannabis retail. ( no construction ) ref 2007-02-27-4993.
-
Jun 2012
Dry-rot repair @ wall of kitchen by dishwasher 7ft. tall x 10ft. long. relocate plumbing line for 3-compartment sink/dishwasher. re-connected electrical for dishwasher @ existing restaurant.
-
Mar 2007
Hood & duct compression system as built.
-
Feb 2007
Change in use to legalize medical cannobis dispensary. remodel rest room and front entrance to comly with title 24.
-
Jan 2007
Upgrade existing range guard, replace existing nozzles, repipe if needed to comply with pipe rules for gal system.
-
Apr 2006
Streetspace.
-
Mar 2006
Replace in kind store front windows. correct dry rot posts between & provide positive connection to existing post.
-
Oct 2005
Requesting anmorization for a change of use for the commercial space from a vacant retail space to a medical cannabis dispensary.new gate with security grill in front of storefront.
-
Apr 1998
Upgrade toilet, relocate bar, erect walls, modify electrical/plumbin.
-
May 1992
Install hood/duct fire suppresion system.
-
Nov 1991
Install type one flue #16 gauge owners 11'-0" hood blower.
-
Nov 1991
Install new equipment.
4 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.