Mar 2024
Change of use and occupancy to convert a ground floor retail store to a hair studio. add (1) new sink.
-
Mar 2021
As-built for permit application 2020-0831-3007 relocation of facu, aes wireless communicator, power supplies, bells pull station, monitor module for sprinkler water flow and tamper switch.
-
Nov 2020
One unit: remodel kitchen in kind. new kitchen cabinets, plumbing fixtures, new lighting, cut existing j box. no change to mechanical. no exterior work. no fire alarm or sprinkler work. no structural required.
-
Aug 2020
Replacment and 2021 mandate installation of fire alarm system in fully sprinklered building. installion of facu ifp75, aes 7707, 5496 power supply, smoke detectors, pull stations, motorbells low freq sounders, monitor modules, to wireless communicator, waterflow and tamper switch, ref 202008272821.
-
Aug 2020
One unit. new office, kitchen cabs, plumb fixtures, washer dryer, dishwasher, new bathrm, lights at ( e ) j-box locations. no change to mechanical. no exterior work. no fire alarm or sprinkler.
-
Aug 2020
One unit: renovate with new kitchen cabinets, new plumbing fixtrues, new lighting existing j-box location. no change to mechanical, no exterior work, no fire alarm or sprinkler work. kitchen remodel in kind. to comply with cec 150.0(k)3.
-
Jan 2020
Relocated posts and concrete footing with details revision to 201908280050.
-
Jan 2020
Renovation two units 3rd level. new dens, new kitchen cabinets plumbing fixtures, new washer dryers dw. new lighting at e jbox locations. no change to mechanical. no exterior work. no fire alarm or sprinkler work. no structural work.
-
Oct 2019
Streetspace.
-
Aug 2019
Renovate of two units. new: kitchen cabinets, plumbing fixtures, with d, d/w, lighting at existing j-boxes. new finishes, new bedrm no change to mechanical/ext/fire alarm or sprinklers. no strucutral work.
-
Jul 2019
To comply with abe program sidewalk flags to create a clear and level landing on ext grade. install 10" continous bottom plate at door bottom.
-
Jul 2019
To comply with abe program replace sidewalk flags to create clear and level landing on ect side. install 10" continous plate at door bottom.
-
May 2019
Renovation of 5 five units (2nd fl). conversion from studio to 1 bedroom in 103, 105 & 106. remodel at 107 and 207 - new kitchen cabinets, new plumbing fixtures, new lighting @ existing jbox locations. new washer/dryers new dishwashers. no change to mechanical. no exterior work. no.
-
Mar 2019
Exploratory demolition at four units, for cost evaluation demolition not to exceed 50 sq ft at each unit, replace in kind existing sheetrock to be demolished.
-
Jan 2017
Install 4 hanging signs, projecting & double faced.
-
Apr 2015
Replace siding for like kind. aprox 500 sq ft tiii siding. all work at rear of building.
-
Dec 2014
Reroofing.
-
Aug 2013
Revision to permit application 201003037506, to comply with nov# 200916785, three units as kitchen, bath remodel.
-
Jun 2013
To renew final inspection for work approved under permit application 2010-0303-7506. all work is done.
-
Aug 2012
Renew app#200503177729 for final inspection. all work complete.
-
Jan 2012
#103, 204, 301 - kitchen remodel: cabinet, counter tops, 50% high efficacy lighting.
-
Dec 2011
To obtain final inspection for work approved under permit application 200202068600.
-
Dec 2011
To obtain final inspection for work approved under permit application 201003037506.
-
Dec 2011
Permit to cover nov #200916762 from housing inspection division only.
-
Jun 2011
Installing dog wash tub. upgrade electrical and lights. no increase in lighting wattage (replace track lighting with flourescent). no switches or plugs per 1134.b.2.1. exp4.
-
Mar 2010
Comply with nov 200916785. access to three units. also comply with nov 200916762 three units. less than 50a% of stairs being replaced.
-
Jun 2007
Amend peremit app#200706073361 to change unit from #108 to #105 no additional work to be done.
-
Jun 2007
Ktichen and bath remodel. in kind. no structural changes. building, plumbing, electrical code upgrade. no windows, door, wall alterations. kitchen at least 50% of lighting wattage flourescent. bath flourescent or motion controlled sensor.
-
Nov 2005
Repalce 2 12"x41" granite step, front of building, comply with 200562449, new granite to match existing.
-
Mar 2005
Replace existing exit stairs (2) in kind same location and same size.
-
Feb 2002
Conversion of vacant crawl space into retail space on 1st floor.
-
Aug 1999
Revision to permit application 9820936.
-
Oct 1998
Unb seismic retrofit bolts.
-
Sep 1993
Reroofing.
-
Jul 1992
Parapet bracing.
-
Jun 1983
Horizontal two story extension to exist building.
5 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.