307–311 Guerrero Street
Mission · San Francisco, CA 94103
Permit history
-
Nov 2021
One unit: sheetrock, mud and tape unit except ceilings: remove and replace kitchen and bath cabinets and fixtures. sheetrock removal shall count towards non-structrual alterations percentage per sfebc 503.11.1.
-
Dec 2019
As built fire alarm plans for app#201911187520.
-
Nov 2019
Upgrade existing fire alarm system and provide monitoring for the sprinkler system and low frequency sounderers in all sleeping area per sffc section 1103.7.6.1. ref app#201806293418 and ref sprinkler #201907317465.
-
Jul 2019
Provide fire sprinkler protection for ground only and new underground fire service per nfpa 24. ref permit application 201806293418.
-
Jul 2019
Revision to app#201806293418: 1)relocate electrical meters. 2)remove washer and dryer for both unit g and h. 3)relocate windows in office, living room and bedroom (unit h). 4)change windows isze in living room and hallway (unit g).
-
Jun 2018
Adu per ordinance 162-16 on basement floor (unit g & h) both units with a bedroom, kitchen, living room, 3 fixtures full bath & an office per plan. structural deferred under separate permit. no cfc until structural approval and inspections.
-
Sep 2017
Soft story retrofit per sfebc chapter 4d per engineering criteria 2016 cebc appendix a-4.
-
Jun 1999
Not vis frm street, replace four windows and damaged wood.
-
May 1999
Repair existing balcony & stairs no change.
-
Oct 1997
Reroofing.
-
Nov 1983
Install solar domestic water heating.
4 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.