541–547 Guerrero Street
Mission · San Francisco, CA 94110
Permit history
-
Oct 2025
Replace fire alarm system to meet sq ft/ca codes & add lf horns in units + add wireless radio monitor.
-
May 2018
Remove window scope of work from permit application 2017-0403-3059.
-
Apr 2017
One unit: at bedroom, remove double-hung wood frame window and replace in-kind with wood window; change one electric light switch in kitchen; in bathroom, replace sink and cabinet and rusted pipes and cracked plaster on ceiling and install 5/8 type x sheet rock. to comply with nov 201764228.
-
Sep 2014
Work in one unit: replace tub in master bath. plumb in new tub. replace 1 outlet (gfci).
-
Sep 2010
Voluntary installation of 5/8" anchor bolts @ perimeter foundation, 16" c.c. with 7" embodment, drilled & expoxied. install new 1/2" struct i plywood with 10d 6"cc edge & 12" field nailing @ perimeter wall & existing cross walls where existing foundation occurs. add a35 clips @16"cc @ walls to existing rim or blacking.
-
Jun 2004
Reroofing.
-
Mar 2004
Remove and replace interior exterior handrails front entrance exterior 2 unit apt interior.
-
Aug 1989
Remove all loose ceramic tiles and throw away.
-
Jan 1989
Remove all lose ceramic tiles around bath tub.
3 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Know any of it? Tell us — just describe it in plain words.