639 Guerrero Street
Mission · San Francisco, CA 94110
Permit history
-
Jun 2011
Repair & replace damaged, loose, rot damaged part of the secondary stairway. repair & replace top landing and rot damaged stucco wall, approx 120 sq ft, less than 50% of structure.
-
Apr 2011
Remodel one bathm & one kitchen all in one unit. bath: all ceramic wall, linoleum floor tiles will be replace with ceramic tiles, replace bathtub, sink, oilet. replace alum frame window with a vinyl window @ bath, liv & bedrm (3 windows not visible fr street). kitchen: replace countertop, sink, range, vent hood.
-
May 2003
Repair side exterior stairs and decks including where deterioration posts, guardrails, joist and tr.
-
Oct 1992
Reroofing.
Not yet documented: the architect and builder, the early residents and the date of the last recorded sale. Know any of it? Tell us — just describe it in plain words.