65 Guerrero Street
Mission · San Francisco, CA 94103
Permit history
-
Jun 2019
Items 1, 2, 3, 4, 5, 6, and 8 per markoff report # 19122 dated 3/19/2019 and item 1 per supplemental report dated 6/5/2019.
-
May 2019
Skylight repair per nov# 201952801 #3.
-
Jul 2016
Revision to permit 2016-0308-1510. replace existing electrical heaters in kind. no life safety of sprinklers required.
-
Mar 2016
Interior alteration replace existing 3 bath and kitchen in kind without altering size and rooms. no alteration of wall, window and door.
-
Feb 2016
Revision to ref pa 2015 0708 0934: replace existing brick foundation with concrete one. backfill abandoned boiler room and its exterior access staircase. replace deteriorted partial subfloor framing.
-
Jul 2015
Soft story retrofit by upgrading gr floor walls to shear walls per sq ft 34 b, 2012 iebc apprendix a-4.
-
Nov 2007
Replace 80 aluminum windows with "zwc" brand wood replacement windows matching existing sytle (the window u<0.67) all wood window.
-
Nov 2006
Reroofing.
-
Nov 1993
Tearout and rebuild stairway.
-
Aug 1993
Repair back stairway, replace dry rot, prime & paint.
-
Sep 1991
Reroofing.
5 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.