940 Guerrero Street
21-unit apartment building
-
1962
Built.
-
Dec 1997
Dry rot repair.
-
Apr 2005
Replacing 1 fire door from stairwell to roof - 1 hr (in kind replacement).
-
Oct 2005
Replacing kitchen cabs & sink, adding gfi plugs in kitchen & bath. replacing bathtubs in no 5, 8. replacing bathroom vanities, replacing shower valves in 5, 8. provide flour light in kitchen & bathrm, at least 50 percent of kitchen lights must be flour light.
-
Jun 2022
Four units: kitchen remodel in-kind. bathroom remodel in-kind. lvt flooring. paint. remodel 1 bath and 1 kitchen in each of 4 units.
-
Jun 2022
Five units: bathroom remodel like for like. paint. lvt flooring. 5 units with 1 bath in each unit.
-
Jul 2022
Ten units: build new laundry closet. install laundry box, saffit for vent 4", install electric for dryer.
-
Aug 2022
Comply with 201756722/ 201964741: exterior siding repair dry rot.
-
Aug 2022
Dry rot repair at south property line wall (35% approx 600sf). replace siding in kind. maintain 1-hour fire rated assembly including 1 exterior layer of gypsum wall board. maintain existing plywood nailing pattern6d nails, 6" spaceing at edges 12" nailing at field.
-
Sep 2022
Five units: kitchen remodel like for like. replace cabinets, countertops, appliances.
-
Feb 2023
Fire alarm upgrade to comply with ca state fire marshall code #12-001 (7/23/2012) bulletin (9/4/2008). replace fire alarm panel and add lf horns in units and wireless radio communicator.
-
Mar 2023
2/f- two units (3 level): build new laundry closet, install laundry box. new closet wall is nonstructural partition wall.
-
Jul 2023
One unit: build new laundry closet, remodel bathroom like for like. paint & new vinyl flooring thruout.
-
Feb 2024
One unit remodel kitchen and bathroom like for like. build new closet for washer and dryer. paint interior and install vinly flooring.
-
Jan 2025
To comply with nov: 202432079 item #1, #2. dry rot repair, partial demolition of exterior wall at 1st, 2nd and 3rd floors, redo framing wall repair stucco. work is located in the interior lightwell.
-
Apr 2025
Reroofing with hot works. to comply with nov 202432079 violation #1.
-
May 2026
Waterproof 5 walkways. grind cracks, break stucco 10" up on wall to install flashings. detail cracks apply enduro waterproofing system and replace broken out stucco. all work in kind all exterior. 1, 580 sq ft.
-
Jul 2026
Revision to 202605010481: 1st floor only, waterproof grind cracks, break stucco 10" up on wall to install flashings. detail cracks apply enduro waterproofing system and replace broken out stucco. all work in kind all exterior. 240 sq ft.
3 nominal $1 street-space permits are omitted.
Nearby
- 937–941 Guerrero Street Same street
- 943–953 Guerrero Street Same street
- 948 Guerrero Street Same block
- 928–932 Guerrero Street Same block
- 920–926 Guerrero Street Same block
- 908–910 Guerrero Street Same block
- 97–99 Hill Street Around the corner
- 91–93 Hill Street Around the corner