819–829 Hampshire Street
Mission · San Francisco, CA 94110
Permit history
-
Jun 2026
Framing repair exterior walls at mudrooms 2nd, 3rd and 4th floors. (revision to bpa: 202602065416).
-
Feb 2026
Repair of existing multi unit building including exterior cladding, window replacement, rear stair and walkway, structural upgrades, life safety and code compliance improvements and mep repairs. to comply with nov's 201918741, 201960951, and 202031691.
-
Nov 2025
Reroofing: overlay existing roof with 50 mil pvc roof membrane. install vapor barrier, r-10 polyisco rigid insulation, 1/4 dens deck mechanically attached. install duro-last 50 mil white roof membrane. no hot works.
-
Oct 2021
One unit only: kitchen, bathroom, livingroom and bedrooms remodeling. kitchen work- install sink top and base cabinet. install stove kitchen hood. replace washer and dryer at laundry room. rewire for electrical outlets and ceiling lights and relocate subpanels, relocate switch at bathroom.
-
Jul 2021
Foundation repair replace a portion of existing for in kind due to fault grade.
-
Dec 2020
Replacement of old windows, street facing (front). existing and proposed aluminum windows.
-
Jul 2019
To comply with nov 201918741, 201920211, 20194551, 201960951 - remodel existing 5 units (one unit will not have work) modify floor plans, document altered conditions reviewed by inspector.
-
Jun 2019
Kitchen and bathroom upgrade, 3 apartment units. no change to existing wall layouts and life safety equipments. three units.
-
May 2019
Reroofing.
-
Apr 2019
Replacement of all windows on the property - front windows visible from public row will be replaced with double-hung wood windows; rear windows will be replaced with vinyl; all window replacements will be within existing openings.
-
Mar 2019
Replace all windows (108 total) - 28 windows at front to be pella architect series aluminum-clad double-hung wood windows; 80 elsewhere to be milgard vinyl (non-visible). no other work.
-
Jan 2019
Two units, and 827 only. remodel (1) ktichens (2) bathrooms as per code in each unit. non-structural. no change to existing floor plan.
-
Sep 2018
Soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. to comply with nov 201722121.
-
Feb 2015
Replace dry rot damage to rear stair about 25%. to comply with nov#201449783 item #2.
-
Jul 2002
Replace + repair in kind of dry rot damage on rear stairs.
-
Jan 1996
Furnace change out.
-
Jul 1993
Reroofing.
6 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.