1275 Harrison Street
Mission · San Francisco, CA 94103
-
1936
Built.
-
August 17, 1964
Photographed, showing the McBean and Company.
-
Mar 1982
Sign - erect.
-
Jul 1983
Remodeling salvation army family center counseling group.
-
Sep 1987
Remodel 3 shower stalls including new tile/drywall/plumbing.
-
Apr 1989
Erect a four story family shelter & transitional housing.
-
Sep 1991
Remodeling of showers to include partitions, electrical. & plumbing.
-
Oct 1992
Cti i ground floor (no cti ii required).
-
Oct 1992
2 x 4 braces anchored to existing parapet.
-
Apr 1994
Remove & replace existing concrete floor remove/repla swer drain.
-
May 1994
Remodel e restrooms in dormitory detox center.
-
Jun 1998
Erect a one story chapel.
-
Nov 2001
Remodel five (5) family clusters common area kitchen and multi-purpose area at each cluster to inclu.
-
Feb 2002
Orig app 8906095, metal panel overlay of e plstr skin, correct learing thru ext walls, metal panels.
-
Feb 2002
Orig app 8906095: metal panel overlay of e plstr skin, correct extensive learing of ext walls, mtl w.
-
Mar 2002
Expand 3/floor toilet facility to add 1 shower stall & 1 toilet stall.
-
Dec 2003
2/f-replace new 7 indoor fan coil units, regrigerant line sets, thermostat modify duct work for new.
-
Jul 2005
Remodel womens dormatory bathroom. voluntary barrier removal. upgrade to fully accessible bathroom.
-
Aug 2007
Bathroom and various remodel on 4th floor merge 2 existing rooms to 1, 4th floor.
-
Dec 2009
New manual fire alarm system with sprinkler monitoring system.
-
Jan 2012
3rd floor attic remodel with new exit exterior stairs & new bathroom & shower room. new finishes to match existing.
-
Dec 2012
3rd floor only install wet sprinkler system with 51 heads. adding 3" ductile iron underground to exterior riser assemebly. system to connect to existing 2" combination water meter.
-
Dec 2012
Replacement of the existing fire alarm system to include new sprinkler monitoring.
-
Feb 2013
Install 2 exhaust fans & ductworm, 4 radiators. ti permit application 2012-0126-2962.
-
Oct 2013
Reroofing.
-
Oct 2015
1st and 2nd floors: provide new fire sprinkler system to make the building fully sprinklered. 3rd floor already sprinklered. building has existing 4-inch fire service. 112 total sprinklers; maher n/a.
DBI holds 41 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 41. 5 of them are nominal $1 street-space or sidewalk permits.
Nearby
- 1170–1180 Harrison Street Same street
- 1350–1354 Harrison Street Same street
- 1040 Bryant Street Same block
- 1060 Bryant Street Same block
- 1030 Bryant Street Same block
- 73 Converse Street Same block
- 397–399 9th Street Around the corner
- 393–395 9th Street Around the corner