1849 Harrison Street
Mission · San Francisco, CA 94103
-
1931
Built as the Municipal Bureau of Supplies central warehouse. The survey suggests John Reid Jr. as a possible architect, undocumented.
-
Feb 1988
Four story office/parking/maintenance building.
-
1989
Built as a commercial building.
-
Jan 2003
Install new frence 8' overall, attach to existing, 1 12'x 8' single slide gate, 1 pedestrian gate.
-
Apr 2007
Remodeling of existing office/surgery into seperate surgery & prep.room. remove existing furniture & accessories in existing office, in surgery remove existing counter sink & ceiling difuser, divide existing office/stor & surgery into 2 rooms by a full hg. glass wall with sliding doors.relcoate cages, cabs, equip.& devices.
-
Jun 2009
Install a total of 11 canvas awnings over 2nd floor windows.
-
Mar 2013
Replace air handlers ahu-1 & install variable air boxes for 2nd floor offices. replace ahu-2 & ahu-3, replace heating water boilers with a new near condensing boilers. upgrade energy management & control system for ahu's & boilers. replace domestic water boilers, storage tank circulating pumps & flues.
-
Dec 2016
Demolish existing fire alarm control units, devices and fire alarm cabling. provide new fire alarm control units, devices and fire alarm cabling per nfpa 72.
-
Feb 2017
Remove 2 waste tank system located on underground concrete valut, remove fuel 1, 000 gallon above ground tanks in mechanical room, 5 new aboveground tanks ul 142, new hose reels, pumps, equipment & piping installed in mechanical room. n/a ordinance #155-13.
-
Jan 2018
Concrete demolition, new concrete foundation maher na.
-
Nov 2020
Ada upgrades to facility which include restroom renovation, hand rails, signage, removal of drinking fountains and door replacement.
-
Jul 2021
Remove six existing vehicle lifts, replace with (5) new in kind automotive lift institute, (ali) certified vehicle lift and associated equipment at scott facility, additional work to be performed, (1) demolition existing lifts and removal attached equipment install new grs conduit wiring and branch circuit breakers.
-
Aug 2021
Replace facp with unimode 10. smoke detectors pull stations replaced. 1 smoke detector added. cell dialer added, monitored by central station.
-
Mar 2022
Renovate, rehab & seisimically retrofit existing 2-story, 29500 sq ft building to provide office and operational space for sfmta parking & traffic enforcement division. install a standard office trailer @ adjacent vacant parcel under permit application 202401234496 to house the division's emergency related operations.
-
Sep 2022
Fire alarm ti: adding cellular communicator to existing notifier nfs-320 fire alarm system.
-
Jan 2024
Site improvement incl new paving, fencing/gates, install std office trailer, generator & port restroom, & electrical bicycle charging stations for the sfmta facility's fleet. st improvement consists of sidewalk expansion along 15th st & alabama st, curb cuts/ramps, new street trees. ref 202203089442.
Not yet documented: the year the building went up, the architect and builder, the early tenants and the date of the last recorded sale. Submit an update