Permit history
-
Jun 2023
To obtain final inspection for work approved under permit application 201910083809 & 201807114257. all work is complete.
-
Jun 2023
To obtain final inspection for work approved under permit application 201803194057 & 201803083162. all work is complete.
-
May 2022
New backflow device to be installed on this system per sq ft water power & sewer.
-
Sep 2021
Nfpa 13d install of a full automatic fire sprinklers system for single family dwelling remodel and addition with a total of 34 sprinklers.
-
Jan 2021
New roof deck, skylights, and stairs from 3rd floor to the roof.
-
Dec 2020
Resubmiting structural drawing rev only: new rear patio (including retaining wall), new reinf. conc.gr bm at line 6-5; slab-on-grade infills and all new structural framing & lateral force resisting elements above the foundation. ref pa201807275802.
-
Jan 2020
Add roof deck <500 sq ft with metal guard around and roof hatch access. 1 hr rated parapet next to hatch only. ref to 201807275902 for addition.
-
Oct 2019
Revision to rear deck and stairs on 2nd fl ref 201807275802.
-
Jul 2018
To abate the notice of violation #32018-001519enf and dbi complaints #201835291 and #201837021 for work done out of scope under bpas #201709279764 and #20180118782. the proposed project includes a one-story vertical addition, façade restoration, rear balconies, and new garage. work.
-
Jul 2018
Revision to permit application 201803194057. comply with n.o.v 201837021. concrete stem wall.
-
Mar 2018
Revision to pa 2018-0308-3162 for emergency shoring, work to comply with required action under nov 201837021.
-
Mar 2018
Emergency soil shoring. work to comply with nov 201837021.
-
Jan 2018
Replace foundation and install concrete slab on the basement floor.
-
Sep 2017
Fix dry rot exterior of the building, kitchen remodel, two bathroom remodel, rewire house electrical, replace electrical panel, demolition all drywall to be replace for new one, insulation as per code, replace water heater, install new hvac unit, interior and exterior finish carpentry, replace galv. pipes.
3 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.