1597–1599 Howard Street
Mission · San Francisco, CA 94103
-
1975
Hoskins Woodcraft moved here from the Western Addition in the mid-1970s.
-
Nov 1989
Ewo-s.
-
Sep 1992
Ad fire door to basemt replace broken glass in exterior doors.
-
Mar 1998
Vertical addition.
-
Mar 1998
Structural work & seismic strengthening of existing2story building.
-
Apr 1998
Tenant improvement for new cafe at level 1.
-
Jun 1998
New awnings.
-
Dec 1998
Revision to 9804627 (replace wood frams wall with concrete).
-
Feb 1999
Install sprinklers in basement-basement for storage only.
-
Mar 1999
New exhaust hood fire suppression on separate application.
-
Aug 1999
Renew 9806242.
-
Feb 2000
Fabricate & install triangular shaped awanings.
-
Mar 2000
Renewal of application 9904968.
-
Jul 2000
Previously permetted walls removed in some location to create 2 bedroom live/work unitnew garage doo.
-
Sep 2000
Install 118 new fire sprinkler heads.
-
Oct 2000
Reroofing.
-
Oct 2000
New stair to basement storge revision to exit corridor delete laundry rm. rev pre permit#20007064482.
-
Dec 2000
Hvac-duck work ventilation for this permit #9804627 9804639.
-
Sep 2001
As built to permit application 200009291987.
-
May 2002
Install electrical sprinkler bell & 2 flow switches. to central station sprinkler 2000/09/29/1987.
-
Dec 2008
Convert existing garage into retail tenant space (unconditioned). new alum. storefront & entry door. new lighting fixtures & electrical outlets.
-
Apr 2009
Revision to application 200812037765. upgrade existing restroom to full compliance/accessibility. fixture re-arrangement only.
-
Aug 2012
Interior non structural improvements to include cabinetry, countertops, finishes, and equipment. all plumbing and electrical work under separate permit. new equip added. no mechanical changes.
-
Dec 2013
Convert existing storage to grow nursery for medical canabis clinic at 1st floor. ** maher: compliance with ordinance no# 155-13 not required. **.
-
Sep 2014
Install new mechanical ventilation system and lighting for tenant improvement for nursery grow rooms in basement. ref 201312063607. maher not req.
-
Mar 2021
Installation of a new sprinkler monitoring system. supply and install ifp-75 fire alarm control panel. aes wireless radio, smoke detector, and monitor modules to monitor existing water flow, existing tampers, and new aes radio.
DBI holds 44 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 44. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update