80 Julian Avenue
Mission · San Francisco, CA 94103
Permit history
-
Aug 1987
Rehabing 2 bathrms at 1st & 2nd fls, change kitchen cabinets.
-
Feb 1990
Reroofing.
-
Apr 1991
Correction ordered by dahi notice of violation attached.
-
Oct 1991
Install fire suppression system.
-
Oct 1991
Appln to change of use from 14 unit tourist hotel.
-
Sep 1993
Change use-14 unit tour hotel to alcohol treatment services.
-
Jun 1996
Disabled access improvementsremoval of architectural barrier.
-
Aug 1996
Revision to appl #9611536.
-
Oct 2002
Applic. to correct occupancy from res. hotel to inst. res. hotel - to correct an abatement of violat.
-
Apr 2003
Change use permit from tourist hotel to h alf way house (presently use as a h alf way hse with.
-
Jun 2005
Repair sink, install laminate flooring, install door locks on all rooms that will be used as dwell.
-
Nov 2006
To comply with nov 200679637.
-
Nov 2006
Removal of partition consturction without permit in kitchen area.
-
Jan 2007
For fire rated doors and replace windows in kind.(to comply with nov#200685853 issued on 01/04/07) items nos. 5& 7.
-
Mar 2007
Repair window sash fromae, repair window to all window to open. return to last legalize as per cfc 200210239719. comply with nov# 200686248.
-
Nov 2010
Erect 4 stories, type 5, 7 bedrooms outpatient dental/medical & congregate residence building.
-
Nov 2010
Demolish 3 stories, 14 guest rooms, type 5 residential building.
-
Dec 2022
Priority process per ab-004: to erect a 6-story & 2 basements, type iv-c, mixed used building.
-
Oct 2024
Excavation and temporary shoring to facilitate the installation and construction of final improvements. the shoring will consist of drilled soldier piles, wood lagging, and tieback anchors.
-
Oct 2024
Shoring and tiebacks at the subject property associated with improvements under site permit #202212098043.
-
Jan 2026
Alt site pa202212098043 ed13-01: increase units to 36.remove lvl b2.lvl 1: lobby space to be restaurant space.lvl 2: office spaces replaced with proposed tech hub.lvl 3: dental care becomes behavorial health floor.lvl 4: med care floor to become residential floor. lvl 5 & 6: minor layout changes.
-
Jul 2026
Pid only permit for pid review of plumbing and storm water control plan plumbing scope.