Mar 2025
Tandoori oven installation. prep sink installation.
-
Mar 2025
Installation of new double-faced electric sign.
-
Dec 2022
Interior has water damage due to fire happened to unit above. to repair electrical, plumbing, and drywall in affected areas.
-
Dec 2022
Interior has water damage due to fire that happened to unit above. to repair electrical, plumbing, and drywall in affected area.
-
Sep 2022
Interior remodel: all bedrooms, living rooms, bathrooms, and kitchen. electrical and plumbing to be updated. replace all existing windows like for like with same dimensions, details and exterior materials.
-
Sep 2022
Selective demolition and structure cleaning after the fire. start of work inspection required.
-
Jul 2022
Drywall plaster demolition walls and ceiling in stairs, bedrooms, closets hallway, bathroom, living room and kitchen one unit. no change of use and no change to exterior.
-
Mar 2022
Reroofing. to comply with coof roof requirements per 2019 california energy code 141.0(b)2b.
-
Feb 2019
Structural revision to soft story permit application 201809140175. memorialize structural modifications based on existing site conditions.
-
Sep 2018
Commercial - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. residential soft story under permit application 201809140175.
-
Sep 2018
Residential - soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial soft story under permit application 201809140172.
-
Mar 2017
Limited renovation to condo in the mission district proposed alterations include conversion of existing den into bathroom and addition of hallway closet.
-
Aug 2015
Remodel existing bath. turn existing 1/2 bath to full. new closet opening on 2nd level only.
-
Jul 2015
Install handrails @ back exterior stair, to comply with nov 201065413.
-
Feb 2012
Remodel to two bathrooms on residential only.
-
Mar 2011
Install fire supression system to kitchen hood and duct.
-
Feb 2011
To comply with complaint/ nov # 201193830 of 2.7.11. revision to permit application 2008.04.10.9369 install new windows on store fronts.
-
Feb 2011
Revision to permit application 2008-0410-9369-remove & replace existing sidewalk for ada level landing.
-
Feb 2011
Revision to approved permit #200804109369, dry rot framing repair: replace window trim and tiles in-kind at the eleven windows at store front facade, finish to match existing. location and elevation refer to previous approved permit.
-
Jan 2011
New gas meter enclousure for 5new residential meters & 1new commercial meter. new foundation for enclouse.
-
Nov 2010
Foundation repair footings. revision to permit application 2010-1012-2778.
-
Oct 2010
Revision to existing permit application #200804109369. relocate kitchen and relocate bar.
-
Jul 2010
To complete work and obtain final inspection for work approved under permit application 200804109369.
-
Nov 2009
Revise cost of work - refer to appl #200906039619, #200908215350, #200908255532.
-
Aug 2009
Revise cost of work 200906039619, 200908215350 to increase construction cost.
-
Aug 2009
Increase scope and cost of work. increased plumbing and electrical work throughout. refer to application # 200906039619.
-
Jun 2009
Remodel kitcens & bathrooms.
-
Jun 2009
Renew permit #1158907, permit application 200806265478. to complete work and obtain final inspection for work under above permit application 200806265478.
-
Jun 2009
To complete work and obtain final inspection for work approved under permit application 200808068573.
-
Aug 2008
Remodel 1 kitchen & 1 bathroom. no cabinets befor in kitchen. install new changing fixture in bathroom. no change of walls, windows or door or exits.
-
Jun 2008
Install electrical closet within existing building at street level.
-
Jun 2008
Structural repair of existing sagging cantilevered bay and existing support column. no change to configuration of existing building.
-
Apr 2008
Retexture of walls & ceilings. refinish wood floring. change windows-2front windows, 6 side windows. size for size. no work on exterior. nov 200851355-bid.
-
Apr 2008
Suspended by dbi-this is re-filing of new pa base on #200802285872 approve in error by planning incl int alter to convert ground floor retail to cafe includes renovate existingbath to handicap bath. replace existing front door with h.c. compliant door. mep under separate permit.
-
Apr 2008
Comply with complaint# 200848939, item# 6. rear (minor) back stairs. work done by previous owner. just need final inspection. repair blocking 2 treads & reinforce hand rail.
-
Feb 2008
Minor alteration to convert gr floor commercial to store/deli to code. includes renovation to existing bathroom to handicap bathroom change of occupancy from m retail to b under 50 occupant cafe.
-
Apr 1996
Reroofing.
-
Apr 1988
Comply with notice of violation 3/22/88, repair rear stairs.