2601 Mariposa Street
Mission · San Francisco, CA 94110
-
Jul 1983
Demolitions.
-
May 1985
New construction.
-
1989
Built as a commercial building, recorded as occupied by KQED.
-
Oct 1989
Sremodel existing building to accommodate t.v & radio studios.
-
Oct 1991
Vertical addition.
-
Jun 2001
Replace existing diesel generator with new. extend existing conc. housekeeping pad to accommodate new generato.
-
Dec 2001
New full ht. non-bearing walls/door/ups equipmt, stru/mechanical/electrical component to support ups.
-
Sep 2002
Oti-1 2nd floor, el, me, ls, sp.
-
Sep 2002
Oti-2 2nd floor, el, me.
-
Nov 2002
Oti-2 2nd floor el me.
-
Nov 2002
Oti-1 2nd floor elme sp.
-
Dec 2002
Structural- acoustic floor & metal stud wall framing.
-
Jul 2010
Furnish & install (1) boiler (like for like) - with five vents & piping; furnish and install (1) pump (like for like); furnish and install 1 thermostatic 3 way valve -(like for like).
-
Nov 2012
Replace existing rooftop air handlers ahu-3 with new packaged rooftop air conditioning unit per plans.
-
Jul 2013
1st floor - adding walls, ceiling joists, & door to create a media arvhile room. electrical, mechanical, sprinklers to be under a separate permit.
-
Jan 2014
Revision to appl #2013.07.31.3268 - move the location of tape library to adjacent area on same floor & add a medchanical lift. #2 compliance with app 115-13 not required.
-
Apr 2014
Revising existing space for raised floor. server rack room. electrical/mechanical/sprinklers are under a seperate permit.n/a maher.
-
Sep 2014
Replace plumbing fixtures with new. extend plumbing piping to new plumbing fixture locations, provide new supplemental floor heaters near shower locations, reroute existing mechanical. ductwork per plan, one toilet under permit application 201408274903. n/a ordinance #155-13.
-
Feb 2015
Level 2: provide electrical for new racks and equipments for nfew tech center. provide power and lighting for new mezzanine and storage room. ref app#201408274902. n/a for the maher.
-
Feb 2015
Level 2: furnish and install new ducting supply and return new fan coil. new condensing units. ref app# 201408274902. n/a for the maher.
-
Jul 2016
Remove and replacew 1 existing 85 ton packaged hvac unit maher na.
-
May 2018
Furnish & install (2) new vrf split system hvac cooling only units to serve electrical closets. n/a for maher.
-
Sep 2018
Enlarge entry & expand footprint @ nw corner. add mezz at roof level for multipurpose meeting room, catering kitchen, lunch room & roof terrace, renovation of interior spaces, seismic improvements, mep upgrades. maher n/a.
-
Aug 2019
Tempotary shoring for structural work coverd under shoring posts and shoring towers installed under existing slabs.**maher n/a**.
-
Jun 2020
Modify existing fa, add (2)remote annunciators, (7)remote power supplies, (6)sync output modules for power supplies, (5)smoke detect, (30)control relays, (12)monitoring modules, (161)ceiling horn/strobes, (26)wall mount horn/strobe, (20)wall mount strobes, (49)ceiling strobes, (1)heat detector, (21) duct.
-
Jul 2020
Added sidewall heads to top of freight elevator shaft, added clarification notes for hazardous storage conditions and codes that design is complying to in the other clarifications section on the right of each sheet.
DBI holds 105 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 105. 3 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update