95 Mccoppin Street
Mission · San Francisco, CA 94103
Permit history
-
Jul 1992
Vertical.
-
Jan 1995
Interior demolition only.
-
Jan 1995
Underpinning above building s.
-
Sep 1995
Fire sprinkler system foil 2 level of parking & 4 floors.
-
Apr 1996
Revision to application 9515148.
-
Nov 1996
Install monitored fire alarm system see 9210958.
-
Jan 1997
Construction revison to permit application 9210958.
-
Sep 2005
New exterior stucco wall finishes on west wall.
-
Sep 2005
Repair work to roof, repair of windows & flashing in stucco section of west wall.
-
Apr 2006
Renew permit application 200509284195.
-
Feb 2009
Dry rot repair - replace joist in basement electrical room.
-
Dec 2009
One unit-remodel the kitchen & bathroom-all work is non-structural work on 4th floor.
-
Mar 2010
Remodel kitchen & bathroom. remove & replace all appliances and millwork. all work is non-structural in unit e404. 4th fl.
-
Apr 2010
Subdivide existing commercial spce into two units, new entry door, new partial wall, no new plumbing fixtures.
-
Jun 2010
4th floor. remove existing tub and replace with shower. tile floor and walls. remove and replace existing lav. and toilet. no lighting work. no change to exhaust system.
-
Mar 2011
#e404 - revision 201003097797 to delete bathroom from scope of work in one unit. applying to indicate the bathroom is not to be remodeled under permit application 2010-0309-7797.
-
Nov 2015
Remodel bathroom. no change to layout of fixtures. new flooring, tile, fixtures, toilet, tub, sink in one unit 105. no change i n wall and opening layout. high efficacy lighting.
-
May 2016
#e408- water damage in kitchen, new insulation & drywall, new cabinets, same foot print, remove & reset existing appliances. repair in kind. n/a ordinance #155-13.
-
Jun 2016
Kitchen remodel in-kind, no walls to be removed/moved.
-
Aug 2017
No change. interior decoration of existing coffee shop. update reriger. equipment & oven. no change to existing plumbing & electrical. refer to original permit application 200709072133. maher na.
-
May 2019
Retail space rehabilitation. new partitions, new rear exit door. relocate door to electrical room.
-
Oct 2020
New light storage platform in office space at ground floor connected space.
-
Dec 2023
Change of use from previus retail to design professional office.
-
May 2026
In-kind remodeling of 1 bathroom(s) in 4th fl with 0 shower pan(s).
DBI holds 28 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 28. 2 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update