1519–1535 Mission Street
Mission · San Francisco, CA 94103
-
1936
Listed in the telephone directory as Herbst Bros sheet metal.
-
1953
Listed in the city directory as Herbst Bros garbage can manufacturers.
-
Apr 1984
Sign - erect.
-
Nov 1984
Wood stud-sheetreck partions with plate glass & wood trim.
-
Jul 1987
Remodel studio space, remove non structural walls, electrical/hvac.
-
Jun 1989
Tenant improvement, install dark rooms, toilet room.
-
Oct 1989
Parapet.
-
Oct 1989
Reroofing.
-
Jun 1990
Seismic strengtheng to sec. 2313.
-
Apr 1991
Isntall offices in 9e) space include 2 mezz 2 saths.
-
Jul 1991
Reroofing.
-
Oct 1991
New elevator from g/f to mezz & 2nd floor.
-
Jan 1992
Revise app #9119397/3 increase size of 1/f front mezz.
-
Jun 1998
Erect a four story three unit residential building.
-
May 2003
Install automatic fire sprinklers. fully sprinklered according to nfpa 13.
-
Dec 2007
Interior remodeling for barrier removal. construct level landing for accessable entrance, 3 new accessable restrooms, create 2nd means of egress at rear of buildng and repair mezzzanin floor joist.
-
Nov 2008
Remodel existing bar including new ada restrooms, and reconfigured existing upper mezzanine. new hvac, air handler, and condenser. replacement of electric tank hot water heater.
-
Oct 2009
Revision to appl #200811035693 - addition of a second exit to the street at rear including construction of storage, new wall, new stairs & replacement o fexisting exterior door. re-designation of assembly type & occupant load for areas of existing bar.
-
Mar 2010
Install sprinklers in lounge & rear existing hallway along with a new 4" dedicated fire service.
-
Mar 2011
Revision to permit application 2008-1103-5693-expand existing bar & provide additional exits. verify increased occupant load for sffd assembly permit.
-
Mar 2011
Install additional fire sprinklers to the new + existing bar/lounge/office & storage area + bath in rear of building using existing 4 inch fire sprinkler. existing sprinkler system and fire service was installed under appl #2010/03/16/8330.
-
Oct 2011
Installation of new fire alarm system as part of tenant improvement for sloane bar.
-
Dec 2011
Re-inforce existing mezzanine.
-
Jan 2015
Light demolition of existing floor tile. call field inspector prior to work. not be change any floor elevations. grind, polish exist slab. demolition of floor tiel only at front bar & area. approx 1350 sq ft.
-
Feb 2015
Renovate existing front bar, new interior non structural wall. new ada compliant lavatory sink, maher not req.
-
Jun 2015
Interior t.i.of an existing 1st & 2nd level shell commericical office space within a 3 story comm'l building, scope includes: new interior non-structural finishes & partitions, doors, lighting, power distribution & signal cabling, millwork, toilet room fixtures accessories & finishe. life safety deferre.
-
Jul 2015
Install 54 new sprinklers per nfa #13 on ground and second floor of new t.i. ref. ti appl. 2015.0612.8919. maher n/a.
DBI holds 49 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 49. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update