1663–1667 Mission Street
Mission · San Francisco, CA 94103
-
1936
Listed in the telephone directory as Blair Corset Co Inc.
-
1953
Listed in the city directory as Artvogue of Cal, Ben Davis Manufacturing Co clothing, Kellogg Switchboard & Supply Co, McRaskey Air Flex Mattress Co, National Supply Service Co Boy Scouts of Am, Pacific Tea Packing Co.
-
Aug 1983
Sign - erect.
-
Sep 1993
Interior imrpovement, walls ceiling flooring, doors etc.
-
Nov 1993
Install new sprinklers & dry stand pipe system for 4 stories.
-
Apr 1994
Mechanical, heating, ventilation, electrical. re.#9316585.
-
Jan 1995
Cti-1 floor 2nd el me sp.
-
Nov 1997
Ct1-1 3rd floor el me sp.
-
Jan 2001
Oti-1, 4th floor, el, me, ls, sp.
-
Jan 2001
Oti-2 4th floor, el, me.
-
Sep 2001
Oti-1 2nd fl ltg, mechanical, ls.
-
Sep 2001
Oti-2 2nd fl el, me.
-
Feb 2010
7th floor work consists of minor demolition & construction as follows: remove exisitng walls, doors & finish, construct new walls, door, sidelights & install new finishes.
-
Aug 2010
Demolition of existing walls & doors. construction of new walls & doors. work occurs on the 1st floor & basement. this work is to install a new electrical vault to service this building.
-
Apr 2011
Suite 320: construct new walls (partition) new doors, side lite. new kitchenette.
-
May 2011
#400: construct new walls (partitions), install doors & sidelite. install/replace kitchenette, relocate sinks & toilets.
-
Sep 2013
New walls, plumbing, power lights, doors, sidelites, new finishes at 710. mep under separate permit sprinkler and fire alarm under separate permit if needed.
-
Oct 2013
Install furnace and ductwork. ref 201309237516.
-
Feb 2015
Remove walls, doors and finishes, construct new wall, door and sidelight. nistall new finishes, replace existing sink and cabinets. maher - not req'd.
-
Sep 2015
2nd floor: remove existing partition walls, door and finishes. construct new partition walls, doors, sidelight and install new finish and outlets. revision to app#201502249187. n/a maher.
-
Nov 2016
#400: remove existing walls, door, and finishes, construct new walls, doors, sidelights and install new finishes; no mechanical. maher n/a.
-
Jun 2017
4/f: remove part of existing interior partition wall and construction of new partition per layout plan. install new lighting and outlets, minor a/c duct work modification.
-
Aug 2017
This project is to upgrade electrical service to the building. remove interior & exterior walls & doors. construct new vault & associated electrical rooms.
-
Aug 2018
Demolition interior wall to construct new walls, doors, sidelight and install cabinet with sink, new lighting and power outlet. approx 2600 sq ft, arch and electrical set. fire under separate permits.
-
Oct 2020
3rd floor - suite 305/320: construct new wall, door & sidelight. install new light for the new office rooms. no exterior work, no change of use as defined by planning code.
-
May 2023
To replace an existing failed fire pump with a new fire pump due to the age of the equipment. a new jockey pump is being provided as well along with new controllers for both pumps.
-
Oct 2023
New ceiling, lighting, and millwork at building lobby.
DBI holds 108 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 108. 8 of them are nominal $1 street-space or sidewalk permits.