1800 Mission Street
Mission · San Francisco, CA 94103
Permit history
-
Oct 1997
Reroofing.
-
Sep 2000
Seismic demolition parking ada include new elevators.
-
Feb 2001
Asbestos abatement soft ddmo remove existing asbestos and lead containing material fr site prep site.
-
Aug 2007
Window replacment in kind, repair e windows per plans, repair and restore e wood windows and replacment of selected deteriorated windows in accordance with approved cert of appropriateness.
-
Oct 2009
Reroofing.
-
Jul 2010
Relocate existing kitchen from the basement floor to the 4th floor room for new kitchen employees.
-
Aug 2010
Provide accessible railings at entry, close off upper mezzanine, provide required exit doors, repair pipe casings per sffd. fire alarm and emergency lighting, and mechanical & electrical all under separate permit.
-
Apr 2011
Refer to sfdbi dept pre-application review minutes attached-new rated partitions & doors to enclose the central stairs @ bsmt level. new tempered glass security wall, tempered glass doors @ 2nd/3rd/4th floors. accessibility modifications to men's & women's restrms, emergency signage under sep perm.
-
Dec 2011
Install 2" fiberglass sound blanket material to the entire surface of interior drill court ceiling, no other work. product name: theater-shield accoustical system.
-
Jan 2013
Replace e broken glass, paint e truss and metal work. install insulation panels on walls and ceilings, install maple floor to replace in kind.
-
Mar 2015
Enlarge existing bathroom to a new womens's restroom for patrons at events at the drill court. upgrade of finishes in men's room. all work is within building envelope. maher n/a.
-
Jul 2016
Tenant improvement consisting of new gender neutral restroom on ground floor (above code minimum required fixtures), new storage room & small accessory lounge space. scope of work is all on ground floor. maher na.
-
Oct 2016
Administrative certificate of approrriateness for exploratory investgation work @ masonry parapet facing julian street & 14th st. purpose to determine condition of structural support of parapet to aid in developing reinforcement solution. n/a for maher ordinance.
-
Jan 2017
Reroofing.
-
May 2018
Selective demolition work of basement, level 2 & level 3. no changes to demolition of structure & rated construction. no exterior work. no work to landmark areas. space to remain vacant per ab017. n/a for maher.
-
Sep 2018
Voluntary seismic retrofit of administration wing. work include new concrete shear walls, associated foundation & localized strengthening. ** maher: n/a **.
-
Sep 2018
Core & shell renovation. work includes improvements to vertical circulation. hvac & plumbing systems. accessibility upgrades, localized window replacement / repair & localized facade repair. ** maher: n/a **.
-
Sep 2018
Voluntary stabilization of the existing masonry parapet at the west facade, gable end walls. work to occur above ground floor.
-
May 2019
Revisio to 201809190778. revision to previously approved seismic retrofit to accomodate additional roof loads of future occupancy at roof. roof occupancy under future permit.
-
Sep 2019
Reference appln #201809190782. install new 6" fire service, backflor & fire pump. install new fdc, standpipe system & automatic sprinkler system throughout (total 1672 heads).
-
May 2020
Fire alarm existing notifier nfs2-640 will remain, add to cellular communicator, annunciator, amplifier & strobe power supplies, 19 smoke, 2 heat detectors, 1 manual pull, 2 pull mods, 10 dual input mods, 9 control mods, 5 isolator mods, 91 speaker strobes. ref permit application 201809190782.
-
Aug 2020
Deferred submittal for stairs and railings. new stairs #4 and #5. revision to app#201809190782.
-
Nov 2020
As-built for permit application 201909111304. install new 6" fire service, back flow & fire pump. install new fdc standpipe system & automatic sprinkler system throughout. (total 1672 heads) $514.62.
-
May 2022
Temp installation for event at sq ft armory drill court. temp wall and rigging to be installed and removed after 10/1/22. temp extension of life safety system ( at sffd request.
DBI holds 81 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 81. 25 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder and the early tenants. Submit an update