1885 Mission Street
Mission · San Francisco, CA 94103
Permit history
-
Jul 1985
Install stair & stairwell.
-
Jul 1987
Sash replacement.
-
Jul 1995
Reroofing.
-
Jul 1996
New h/c accessble elevator & lobby (men & women's toilet).
-
Jul 1996
New partitions, electrical outlets and exit signs.
-
Feb 1997
Renew expired permit appn.9613942.
-
Aug 1998
One-stop, work incl partitions, doors, frames, bath @ 1st floor.
-
Jan 1999
Modification of previously appvd 9817189, 9709816.
-
Aug 1999
Office build out at 1st floor: toilet rm and vestibule.
-
Sep 2000
Modification to permit#9916023. presently in construction. work modified are offices at 1st fl leve.
-
Aug 2001
To renew app#2000/11/29/6759 for final inspection only.
-
Aug 2001
To renew app#9917265 for final inspection only.
-
Mar 2002
Divide two offices in half to form four offices, new partitions door frames rework existiing windo.
-
Oct 2002
New child care center, incl demolition, new partition, frame, toilet.
-
Oct 2004
Rev. to appl#200203211984 add 2 interior walls.
-
Sep 2015
Comply with nov 201302222, core and shell upgrade of unoccupied building. 1) new accessible kitchen/bathrm construction at three floors; 2) new voluntary structural strengthening at three floors; 3) holes cut in 2nd & 3rd floors for future stairs - design build by owner/tenant improvement.
-
Sep 2015
1st, 2nd, 3rd floors: unoccupied bld - prep for future ti - demolition of non-structural interior partitions. demolition of existing mep equip. all existing structural walls, columns & framing to remain. no exterior work. per ab-017.
-
Oct 2015
1, 2&3 fls. reloc main entrance fr corner of 15 st&mission st, to be loc on mission st.new exterior garage doors, door& window on east facade.new non-stru int partions all 3 fls-new wood int stair inexistingfl opening fr 1st-2nd fl with rated enclosure@2/fl.new stair fr 2nd-3rd fl inexistingopen.
-
Oct 2015
(2nd floor only) new wood interior stair in existing floor opening from 2nd to 3rd floor, new non structural interior partitions.
-
Oct 2015
(3rd floor only) new non structural interior partitions - change of occupancy.
-
Dec 2016
Replace 5 existing gas pack units and 7 split systems with new and duct work. ref app#201510220503. n/a for maher.
-
Mar 2017
Installation of new f/a system incvluding new fire control panel, power supply, s/d thru-out & pull station at every exit in non-sprinkled building, notification appliances thru-out all floors. relay mods for elevator recall. ref permit application 201510220503.
-
Apr 2017
Approval of title 24 for lighting and controls. n/a for maher ref app#201510220503.
-
May 2017
As built 201703282563, remove alternate and fireman that relay modules from elevator recall these elevator recall functions not installed at this time. n/a for maher.
DBI holds 34 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 34. 1 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the architect and builder, the early tenants and the date of the last recorded sale. Submit an update