2230–2232 Mission Street
Mission · San Francisco, CA 94110
Permit history
-
Aug 2025
Upgrade existing restroom to fully accessible. all general restroom as part of the barrier removal per code.
-
May 2025
Foundation repair, replace due to field condition. reference building permit# 2018-0914-0336. upgrade existing restroom to fully accessible.
-
Jul 2024
Reroofing.
-
Jun 2024
Upgrade existing fire alarm system to comply with sffc section 1/03.7.6.1.
-
Sep 2018
**residential**. soft story retrofit installation of plywood shear walls & foundation per sfebc chapter 4d engineering criteria. 2016 cebc appendix a-4.
-
Sep 2018
**commercial**. soft story retrofit per sfebc chapter 4d engineering criteria. 2016 cebc appendix a-4. installation of steel moment frames, plywood shear walls and foundation. the design is per 2016 cebc appendix a-4.
-
Oct 2009
Mta only.
-
Dec 2006
Emergency fire panel replacement-reference 2001 cfc section 2001 cbc sections 403.
-
Sep 1985
Bring into compliance as required by dahi.
3 nominal $1 street-space permits are omitted.
Not yet documented: the architect and builder and the early residents. Know any of it? Tell us — just describe it in plain words.