2301–2303 Mission Street
Mission · San Francisco, CA 94110
Permit history
-
Sep 1982
Building use: dwg.
-
Jul 1984
Wall framing with metal studs to create electronic showroom.
-
Dec 1986
Install partition walls in exist open space.
-
Mar 1991
Reroofing.
-
Jul 1999
Parapet bracing.
-
Aug 2000
Parapet rehabilitation.
-
Feb 2003
Seismic retrofit. ada upgrades.
-
Aug 2008
Demolition of exist partitions, storefront and facade infill, modest lateral stystem improvment (voluntary), new exit stairs, elevator, skylights, storefront and facade improvments, partitions, restrooms, electrical/mechanical infrastructure for future tenant improvments for by others 9/19/08: premium plan-check.
-
Apr 2009
Revision to application 200808229871. structural revisions only due to field conditions (delta 3 & 4 only, clouded), no architectural changes.
-
Apr 2009
Demolition and removal of existing damaged first floor joist and subfloor. new concrete slab at first floor to replace existing floor. revision to appl. # 2008/0822/9871.
-
Jun 2009
Istall new fire alarm system for entire building. 81 devices to be istalled.
-
Jul 2009
T.i. of 3 officspaces with in approved coreshell. int. work only to incl; non-bearing partitions, millwork, wall & floor. finishes, bathrm. addition on ground floor. changes to core & shell triggered by tenants request incl; operable windows to fit existing window openings on 2nd. floor. reconfig. of hallway 305.
-
Sep 2009
Revision to application 200808229871. revise details/ size of ramp, dimensions & door layout of bathroom. delete "future prof. services" office & sink. add shower and kitchenette all at 2nd floor.
-
Oct 2009
Install 5 furnaces, 2 roof packaged units, ductwork, 11 fire/smoke dampers, 1 supply fan, 1 roof exhaust fan, 5 bathroom fans. ref permit application 2009-0722-3207 for t.i.
-
Nov 2010
Removal of existing brick infill on south facade for one new property line window at ground floor. work to be per admin bulletin ab-009.
-
Feb 2011
Installation of two new 4' x 6' skylights at existing roof. original tenant improvement work under permit application 200808229841.
-
Mar 2016
Window replacement with new aluminum clad wood.
-
Sep 2016
Install aluminum clad wood windows on 3rd floor, traditional double hung style, 21 windows total; mission and 19th street facades. no change to existing openings.
-
May 2017
Reroofing.
-
Dec 2017
Interior remodel of existing commercial space; including, reconfiguration of prfessional services, reconfiguration of retail space & construction of new accessible bathrooms. retail space to be divided into 5 different tenant spaces.
-
Dec 2017
Interior remodel of existing commercial space; including construction of new limited resturaunt vendors (2), with common dining space. reference #201712196847 for commercial space remodel.
-
Apr 2018
Revision of building fire alarm system to accomodate remodel of lobby area. ref app#201712196847.
-
Jul 2018
Revision to 201712196855 installation of new sump pump and submetering of new sump pump. revision due to incorrect measurement of existing waste piping ht, discovered during field excavation.
-
Apr 2024
Tenant improvement 2nd and 3rd fl break rooms. includes new flooring finishes, new base cabinet island at 3fd fl brk rm. electrical work will consist of adding outlets /switches, relocate electrical panel. add alternatte work to add small office at 3rd fl.
DBI holds 63 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 63. 19 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the developer and the early tenants. Submit an update