37.7601, −122.4188 A locator map appears here once a Mapbox token is configured.

2301–2303 Mission Street

Mission · San Francisco, CA 94110

  • Built 1911
  • Store building
  • 2 stories
  • Zoned NC-3
  • District 9
  • Historic status: historic resource
37.7601, −122.4188 Street View appears here once a Google Maps embed key is configured.
19,260 sq ftBuilding area
8,430 sq ftLot area
8Rooms · 3 baths

Permit history

  1. Sep 1982

    Building use: dwg.

    Complete Permit 8208042 $$$ $6,968
  2. Jul 1984

    Wall framing with metal studs to create electronic showroom.

    Complete Permit 8407422 $$$ $30,000
  3. Dec 1986

    Install partition walls in exist open space.

    Complete Permit 8616370 $$$ $25,000
  4. Mar 1991

    Reroofing.

    Complete Permit 9104726 $$$ $27,500
  5. Jul 1999

    Parapet bracing.

    Cancelled Permit 9914854 $$$ $75,000
  6. Aug 2000

    Parapet rehabilitation.

    Expired Permit 200008319403 $$$ $20,000
  7. Feb 2003

    Seismic retrofit. ada upgrades.

    Complete Permit 200302288505 $$$ $160,000
  8. Aug 2008

    Demolition of exist partitions, storefront and facade infill, modest lateral stystem improvment (voluntary), new exit stairs, elevator, skylights, storefront and facade improvments, partitions, restrooms, electrical/mechanical infrastructure for future tenant improvments for by others 9/19/08: premium plan-check.

    Complete Permit 200808229871 $$$ $1,000,000
  9. Apr 2009

    Revision to application 200808229871. structural revisions only due to field conditions (delta 3 & 4 only, clouded), no architectural changes.

    Complete Permit 200904287218 $$$ $25,000
  10. Apr 2009

    Demolition and removal of existing damaged first floor joist and subfloor. new concrete slab at first floor to replace existing floor. revision to appl. # 2008/0822/9871.

    Complete Permit 200904287204 $$$ $30,000
  11. Jun 2009

    Istall new fire alarm system for entire building. 81 devices to be istalled.

    Complete Permit 200906291525 $$$ $40,200
  12. Jul 2009

    T.i. of 3 officspaces with in approved coreshell. int. work only to incl; non-bearing partitions, millwork, wall & floor. finishes, bathrm. addition on ground floor. changes to core & shell triggered by tenants request incl; operable windows to fit existing window openings on 2nd. floor. reconfig. of hallway 305.

    Issued Permit 200907223207 $$$ $100,000
  13. Sep 2009

    Revision to application 200808229871. revise details/ size of ramp, dimensions & door layout of bathroom. delete "future prof. services" office & sink. add shower and kitchenette all at 2nd floor.

    Complete Permit 200909287776 $$$ $50,000
  14. Oct 2009

    Install 5 furnaces, 2 roof packaged units, ductwork, 11 fire/smoke dampers, 1 supply fan, 1 roof exhaust fan, 5 bathroom fans. ref permit application 2009-0722-3207 for t.i.

    Complete Permit 200910138797 $$$ $206,000
  15. Nov 2010

    Removal of existing brick infill on south facade for one new property line window at ground floor. work to be per admin bulletin ab-009.

    Complete Permit 201011305792 $$$ $7,500
  16. Feb 2011

    Installation of two new 4' x 6' skylights at existing roof. original tenant improvement work under permit application 200808229841.

    Complete Permit 201102160431 $$$ $8,000
  17. Mar 2016

    Window replacement with new aluminum clad wood.

    Cancelled Permit 201603283268 $$$ $40,000
  18. Sep 2016

    Install aluminum clad wood windows on 3rd floor, traditional double hung style, 21 windows total; mission and 19th street facades. no change to existing openings.

    Complete Permit 201609168007 $$$ $32,000
  19. May 2017

    Reroofing.

    Complete Permit 201705015329 $$$ $180,000
  20. Dec 2017

    Interior remodel of existing commercial space; including, reconfiguration of prfessional services, reconfiguration of retail space & construction of new accessible bathrooms. retail space to be divided into 5 different tenant spaces.

    Complete Permit 201712196847 $$$ $200,000
  21. Dec 2017

    Interior remodel of existing commercial space; including construction of new limited resturaunt vendors (2), with common dining space. reference #201712196847 for commercial space remodel.

    Complete Permit 201712196855 $$$ $125,000
  22. Apr 2018

    Revision of building fire alarm system to accomodate remodel of lobby area. ref app#201712196847.

    Complete Permit 201804025276 $$$ $12,000
  23. Jul 2018

    Revision to 201712196855 installation of new sump pump and submetering of new sump pump. revision due to incorrect measurement of existing waste piping ht, discovered during field excavation.

    Cancelled Permit 201807316044 $$$ $19,000
  24. Apr 2024

    Tenant improvement 2nd and 3rd fl break rooms. includes new flooring finishes, new base cabinet island at 3fd fl brk rm. electrical work will consist of adding outlets /switches, relocate electrical panel. add alternatte work to add small office at 3rd fl.

    Complete Permit 202404180279 $$$ $110,000

DBI holds 63 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 63. 19 of them are nominal $1 street-space or sidewalk permits.

Not yet documented: the developer and the early tenants. Submit an update