2401–2417 Mission Street
Mission · San Francisco, CA 94110
-
Mar 1984
Complying to property conservatio complaint.
-
May 1984
Sheetrock ceiling of vacant store as per fire.
-
Aug 1985
Correct sub standard conditions, new carpets, tile, paint.
-
Apr 1987
Seismic upgrade/bracing walls with shear panels.
-
Oct 1988
Install garbage room in abandoned freight elevatpr.
-
Oct 1989
Replace store front with safety glass, doors, windows.
-
Sep 2009
Erect a electric, single faced wall sign.
-
May 2012
To comply with nov dated 200448143, 3-3-04: new 13 fire sprinkler system, 238 heads on 2nd floor only. underground included. to meet sbo ordinance.
-
Feb 2013
Interior non seismic conversion of an existing tenant space to a coffe shop. new storefront, new partitions, service counter, 2 new accessible restrooms. work to be completed on gr fl space only.
-
Jun 2015
Install fire profer door in kitchen/porch and repair holes in wall and floors. cleaning and remove all trash from lightwell and hallways. to comply with nov #201281315a, 201449771a, 201462651a.
-
May 2016
Voluntary fire sprinkler system per nfpa 13 in basement and 1st floor only to oh2 design; connect to existing fire system. completion of this voluntary work will result in full building sprinkler protection.
-
Jun 2016
Interior non structural demolition of existing interior 1st fl ti space. scope to include removal of e interior partitions, e plumbing fixtures, e finishes. e 1st fl ti space to remain vacant. ab-017.
-
Jul 2016
Change of use of existing ground floor vacant space into a cafe/restaurant. work done under seperate permit.
-
Aug 2016
Tenant improvement of existing ground floor tenant space for new laundromat. scope of work to include: new laundry area, new accessible restrooms, new office/storage & new waiting area. no residential guest rooms to be deleted.
-
Oct 2016
Remove 1 hvac unit relocate 2 others. electrical work will be necessary. both units will be reattached to roof in a safe manner per code. not visible from street.
-
Jan 2017
Tenant improvement of existing ground floor space into a full bar. scope of work to include new interior partitions, new accessible restrooms, new bar equipment and new finishes.
-
2018
The Doc's Clock sign was moved here in 2018. Separated from the building it was made for, it counts as an object rather than a feature of this one.
-
Jan 2018
New tenant - change of use from retail to hollistic. partial tenant improvement - removal & addition of non-load bearing partitions. no change to storefront. remodel & relocate 2 bathrooms. 1 accessibe. no change to egress, occupancy, no increase. all work within b occ, no work in common areas with r1.
-
Apr 2018
Add 11 fire sprinklers to new ceiling for added offices. ref app#201801299759.
-
Oct 2020
T.i. to construct an enclosed yoga studio room within an existing commercial space.
-
Dec 2020
Condition basement as commercial space for 2 new commercial tenant spaces & storage. add 1 abe on mission & reconfigure/upgrade 1 abe on 20th st. 1 new interior wheelchair lift. 2 new stairs to basement & 1 reconfigured stair to basement. 3 ada baths. 2 drinking fountains. 1 new 1hr. exit corridor.
-
Feb 2022
Reroofing, remove the main top flat roof and middle lower roof and install modified bitumen with 2 layers of base.
-
Mar 2022
Add accessible single accomodation toilet to laundry mat. laundry mat and cafe were built in 2016 under one permit 201608054351. laundry mat relinquested the cafe space. laundry mat will no longer have access to existing toilets located in cafe space.
-
Apr 2024
Renovation/remodeling of two common bathrooms in kind and one common kitchen.
-
Jun 2024
2nd floor: remodel (2) existing bathrooms with new finishes and fixtures: no work on commercial ground floor spaces.
DBI holds 76 permits for this parcel, most of them tenant improvements on individual floors. The timeline shows the 24 largest by stated cost, plus the earliest on file; the DBI query in the sources below returns all 76. 9 of them are nominal $1 street-space or sidewalk permits.
Not yet documented: the year the building went up, the architect and builder and the early tenants. Submit an update